Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Improve ecological function and protect the IRAM area from future disturbances and recontamination by removing soil, sediment, and wood wastes, and performing restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procuring a single, stand-alone contract for the Raritan Bay Slag Superfund Site Operable Unit 1 - Seawall Sector Remedial Action. Remediation will consist of the dredging/excavation, and removal of source materials (i.e., pieces of slag comingled with crushed battery casing materials and associated wastes that act as sources of contamination), and contaminated soil/sediment from the areas located in the Seawall Sector. Source materials, contaminated soil/sediment, riprap/armored stone, and miscellaneous debris will be removed. The Remedial Action Objectives, (RAOs) are organized into these categories: slag, battery casings, and associated wastes, which comprise the highly toxic source material principal threat waste (PTW); soil; sediment; and surface water.
Posted Date
Nov 21, 2025
Due Date
Jan 20, 2026
Release: Nov 21, 2025
Close: Jan 20, 2026
Procuring a single, stand-alone contract for the Raritan Bay Slag Superfund Site Operable Unit 1 - Seawall Sector Remedial Action. Remediation will consist of the dredging/excavation, and removal of source materials (i.e., pieces of slag comingled with crushed battery casing materials and associated wastes that act as sources of contamination), and contaminated soil/sediment from the areas located in the Seawall Sector. Source materials, contaminated soil/sediment, riprap/armored stone, and miscellaneous debris will be removed. The Remedial Action Objectives, (RAOs) are organized into these categories: slag, battery casings, and associated wastes, which comprise the highly toxic source material principal threat waste (PTW); soil; sediment; and surface water.
AvailableProvide and install (2) replacement operable walls in the cafeteria.
Posted Date
Nov 21, 2025
Due Date
Dec 19, 2025
Release: Nov 21, 2025
Close: Dec 19, 2025
Provide and install (2) replacement operable walls in the cafeteria.
AvailableWork includes approx. Removal of all excess liquid from both the containment tank, floor sump, and sulfuric acid piping. Cleaning of all adjacent surfaces and all associated piping to ensure complete removal of solids and any sulfuric acid residues. Proper removal and disposal of the sulfuric acid storage tank. Grating removal/replacement and installation of new support beams where grating is damaged. See outside link for more details.
Posted Date
Nov 13, 2025
Due Date
Dec 17, 2025
Release: Nov 13, 2025
Close: Dec 17, 2025
Work includes approx. Removal of all excess liquid from both the containment tank, floor sump, and sulfuric acid piping. Cleaning of all adjacent surfaces and all associated piping to ensure complete removal of solids and any sulfuric acid residues. Proper removal and disposal of the sulfuric acid storage tank. Grating removal/replacement and installation of new support beams where grating is damaged. See outside link for more details.
AvailableProvide pilot fiberboard machine.
Posted Date
Dec 4, 2025
Due Date
Dec 18, 2025
Release: Dec 4, 2025
Close: Dec 18, 2025
Provide pilot fiberboard machine.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis