Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remediation of soil associated with several contaminants of concern detected at elevated concentrations during Site Investigation and Remedial Investigation activities conducted on-site. Contaminants of concern generally consist of various volatile organic compounds (VOCs), Semi-volatile organic compounds (SVOCs), poly aromatic hydrocarbons (PAHs), and Metals. Remediation of contaminated soil (as well as other concrete features) shall be completed through excavation, disposal, capping, a deed notice and associated Remedial Action Permit (RAP) for soils.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes a new pk-5 elementary school of approximately 60,461 square feet, housing grades prekindergarten through 5. The project is to be located at 549a east main street on a site of approximately 5. 42 acres. Project includes abatement and demolition of the former high school.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Close: Dec 18, 2025
Work includes a new pk-5 elementary school of approximately 60,461 square feet, housing grades prekindergarten through 5. The project is to be located at 549a east main street on a site of approximately 5. 42 acres. Project includes abatement and demolition of the former high school.
AvailableThis contract involves site development at the former developmental center, consisting of construction of sewer and water infrastructure and new streetscape construction in the Right of Way. The work is detailed in the contract documents and plans.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
Close: Dec 16, 2025
This contract involves site development at the former developmental center, consisting of construction of sewer and water infrastructure and new streetscape construction in the Right of Way. The work is detailed in the contract documents and plans.
AvailablePark Remediation. Including 80,000 Sf synthetic turf surface system; football field c-surface water runoff; 3,864 SF biorentention media sand and gravel; 3,968 tons soil disposal; 529,840 SF geotextile fabric-site wide; 21,567 tons 14A clean fill - Material/transportation to site; 8,736 tons 14B topsoil-material/transportation to site; 20,202 SY 14C clean fill and topsoil spreading/grading; 9,608 SF brick entryway; 24,617 SF of 2" thick bituminous concrete walkway; 16,308 SF concrete sidewalks; 1,500 SF dugout concrete slab; 2,633 LF of 4" HDPE perforated pipe with filter sock; 80 LF of 12' HDPE solid pipe; 800 LF of 36" HDEP solid pipe.
Posted Date
Aug 25, 2025
Due Date
Dec 17, 2025
Street Parking Lot.
Posted Date
-
Due Date
Dec 19, 2025
Release: -
Close: Dec 19, 2025
Street Parking Lot.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Park Remediation. Including 80,000 Sf synthetic turf surface system; football field c-surface water runoff; 3,864 SF biorentention media sand and gravel; 3,968 tons soil disposal; 529,840 SF geotextile fabric-site wide; 21,567 tons 14A clean fill - Material/transportation to site; 8,736 tons 14B topsoil-material/transportation to site; 20,202 SY 14C clean fill and topsoil spreading/grading; 9,608 SF brick entryway; 24,617 SF of 2" thick bituminous concrete walkway; 16,308 SF concrete sidewalks; 1,500 SF dugout concrete slab; 2,633 LF of 4" HDPE perforated pipe with filter sock; 80 LF of 12' HDPE solid pipe; 800 LF of 36" HDEP solid pipe.
Available