Summary
The scope of work for this project includes 2.5" of milling and the placement of pavement for approx. 1,445 LF. The placement of pavement shall consist of 1" of superpave 9.5mm pg 64s-22 scratch/leveling course and 1.5" of superpave 9.5mm pg 64s-22 wearing course with an average width of forest street being 18'. All depth to be compacted in place and work to include tack cost as per specifications form 408, milling of pavement notches at intersecting roads and driveways and sealing of joints and utilities. Hand or machine placed rolled bituminous curb shall be required. These items are to be incidental to the paving.