Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes connection of temporary tank to existing system, removal of existing tank, construction of 250,000 GAL of bolted steel tank, water meters, fire hydrants, upgrades to existing well house.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Engineering services in connection with the stillwagon road water improvements project.
Posted Date
Nov 27, 2025
Due Date
Jan 9, 2026
Release: Nov 27, 2025
Close: Jan 9, 2026
Engineering services in connection with the stillwagon road water improvements project.
AvailablePremium
Access the largest public sector contact database
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailableThe City of Walhalla is soliciting bids for the Water & Sewer Improvements Project - Division IV, which includes installing approximately 3,600 linear feet of 10-inch water lines in the Poplar Springs Road area and related work. The project is to be delivered using Design-Bid-Build; bid documents are available from Summit Engineering Group for a non-refundable fee of $150 per set. Bids are due December 18, 2025 at 2:00 PM local time and questions should be emailed to the project coordinator prior to the bid opening.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
The City of Walhalla is soliciting bids for the Water & Sewer Improvements Project - Division IV, which includes installing approximately 3,600 linear feet of 10-inch water lines in the Poplar Springs Road area and related work. The project is to be delivered using Design-Bid-Build; bid documents are available from Summit Engineering Group for a non-refundable fee of $150 per set. Bids are due December 18, 2025 at 2:00 PM local time and questions should be emailed to the project coordinator prior to the bid opening.
AvailableWork includes capital improvements project - phase 1 that includes contract #101 - general trades; contract #102 - mechanical; contract #103 - electrical; contract #104 - plumbing; contract #105 - site contract. The project consists of mechanical unit replacements and installations, renovation of a gymnasium, replacement of artificial turf field and track cleaning, mechanical unit replacements and installations, and mechanical unit replacements and installations as well as construction of two grass soccer fields and a parking lot.
Posted Date
Dec 8, 2025
Due Date
Jan 27, 2026
Release: Dec 8, 2025
Close: Jan 27, 2026
Work includes capital improvements project - phase 1 that includes contract #101 - general trades; contract #102 - mechanical; contract #103 - electrical; contract #104 - plumbing; contract #105 - site contract. The project consists of mechanical unit replacements and installations, renovation of a gymnasium, replacement of artificial turf field and track cleaning, mechanical unit replacements and installations, and mechanical unit replacements and installations as well as construction of two grass soccer fields and a parking lot.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis