Summary
Project consists of Replacing three existing pumps and motors with three new pumps and motors, replacing approximately 34 feet of steel discharge piping with new steel piping, valves, check valves,
dismantling joints, sensing equipment, air release valves, field welding, pressure testing, disinfection, startup and closeout; Replacing existing exhaust fan with new exhaust fan and louver; Replacing existing tapping saddle and assemblies for pressure transducers and water quality sensing lines; Excavate and cut into a 36" concrete cylinder water line and install a 24" valve,
with fittings, blow offs, an air release valve, thrust restraint, and trench repair as needed.