Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Covington, Georgia, seeks qualified contractors for the reconduct of overhead utility lines along Flat Rock Road. The project involves labor, equipment, and coordination for utility line extension, installation of poles, crossarms, conductors, and associated equipment, with materials supplied by the City. Proposals must include company information, project approach, team qualifications, cost estimate, and references.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Provide geotechnical engineering and construction materials testing and inspection services.
Posted Date
Dec 4, 2025
Due Date
Dec 16, 2025
Release: Dec 4, 2025
Close: Dec 16, 2025
Provide geotechnical engineering and construction materials testing and inspection services.
AvailableConstruct a standard design Advanced Individual Training (AIT) Battalion Complex to support 600 Soldiers. Primary facilities include: standard design AIT Barracks/Company Operations Facility(ies)(B/COF) for two companies, two (2) lawn equipment buildings, and 2 physical training stations. Construction includes building tornado/storm protection measures; information systems; fire detection and sprinkler suppression systems; integrated energy monitoring and control system (EMCS) connected to base monitoring systems; intrusion detection system (IDS) and alarm systems; and antiterrorism/force protection (AT/FP) measures.
Posted Date
Sep 16, 2025
Due Date
Jan 23, 2026
Release: Sep 16, 2025
Close: Jan 23, 2026
Construct a standard design Advanced Individual Training (AIT) Battalion Complex to support 600 Soldiers. Primary facilities include: standard design AIT Barracks/Company Operations Facility(ies)(B/COF) for two companies, two (2) lawn equipment buildings, and 2 physical training stations. Construction includes building tornado/storm protection measures; information systems; fire detection and sprinkler suppression systems; integrated energy monitoring and control system (EMCS) connected to base monitoring systems; intrusion detection system (IDS) and alarm systems; and antiterrorism/force protection (AT/FP) measures.
AvailableSeeks innovative and community-oriented developer(s) to redevelop phase 1 of the new nicollet/former kmart site.
Posted Date
Oct 6, 2025
Due Date
Jan 6, 2026
Release: Oct 6, 2025
Close: Jan 6, 2026
Seeks innovative and community-oriented developer(s) to redevelop phase 1 of the new nicollet/former kmart site.
AvailableRelease: Nov 26, 2025
Close: Jan 8, 2026
Bank renovations - phase 2
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis