Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD field (hereinafter Bidder or Contractor) to perform a complete HVAC System and Controls upgrade.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Remove the existing HVAC system and install a new, high-efficiency system while maintaining continuous station operations.The HVAC scope covers procurement and installation of packaged heat pump units of various capacities, split systems, ductwork, insulation, refrigerant piping, dampers, silencers, sensors, and a new controls system with head-end equipment and CO₂ sensors. Electrical work includes safe-off of existing systems, installation of a new 400A panel and feeder, and all necessary connections, disconnects, and feeders for HVAC equipment, along with seismic bracing, firestopping, and temporary power.
Posted Date
Jan 10, 2026
Due Date
Feb 10, 2026
Release: Jan 10, 2026
Close: Feb 10, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove the existing HVAC system and install a new, high-efficiency system while maintaining continuous station operations.The HVAC scope covers procurement and installation of packaged heat pump units of various capacities, split systems, ductwork, insulation, refrigerant piping, dampers, silencers, sensors, and a new controls system with head-end equipment and CO₂ sensors. Electrical work includes safe-off of existing systems, installation of a new 400A panel and feeder, and all necessary connections, disconnects, and feeders for HVAC equipment, along with seismic bracing, firestopping, and temporary power.
AvailableRelease: Sep 18, 2025
Close: Feb 12, 2026
HVAC sub-bid contract.
AvailableWork consists of fire station HVAC upgrade.
Posted Date
Dec 29, 2025
Due Date
Feb 3, 2026
Release: Dec 29, 2025
Close: Feb 3, 2026
Work consists of fire station HVAC upgrade.
AvailableFor fire station 1 and balboa branch library project.
Posted Date
Dec 27, 2025
Due Date
Jan 29, 2026
Release: Dec 27, 2025
Close: Jan 29, 2026
For fire station 1 and balboa branch library project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →