Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of converting existing open bunk room (approx 480 SF) into six (6) private lounge rooms, demolition and installation of VCT flooring, base, and act ceiling, construction of partition walls with pocket doors for each lounge, addition of new electrical outlets, data, and cable connections, providing and installing ceiling speakers in each lounge, integration of HVAC supply diffusers, with undercut doors facilitating return air into the hallway with one (1) thermostat located in the hallway, providing and installing all furniture, fixtures, and equipment (FFE), and all associated and incidental work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The base bid work consists of converting existing open bunk room (approximately 480 square feet) into six (6) private lounge rooms. This includes demolition and installation of VCT flooring, base, and act ceiling; construction of partition walls with pocket doors for each lounge; addition of new electrical outlets, data, and cable connections; providing and installing ceiling speakers in each lounge; integration of HVAC supply diffusers, with undercut doors facilitating return air into the hallway with one (1) thermostat located in the hallway; providing and installing all furniture, fixtures, and equipment (FFE); and all associated and incidental work.
Posted Date
Dec 14, 2025
Due Date
Jan 30, 2026
Release: Dec 14, 2025
Close: Jan 30, 2026
The base bid work consists of converting existing open bunk room (approximately 480 square feet) into six (6) private lounge rooms. This includes demolition and installation of VCT flooring, base, and act ceiling; construction of partition walls with pocket doors for each lounge; addition of new electrical outlets, data, and cable connections; providing and installing ceiling speakers in each lounge; integration of HVAC supply diffusers, with undercut doors facilitating return air into the hallway with one (1) thermostat located in the hallway; providing and installing all furniture, fixtures, and equipment (FFE); and all associated and incidental work.
AvailableThe City of Greenacres, FL is soliciting bids for renovation work at Fire Rescue Station 95, covering architectural, mechanical, electrical, and fire protection plan revisions and related construction services. A non‑mandatory pre‑bid conference is scheduled for 2025‑12‑30 via Microsoft Teams, and the bid opened on 2025‑12‑15 and closes on 2026‑01‑30 at 3:00 PM Eastern. This is an Invitation for Bid (construction) and not a grant.
Posted Date
Dec 15, 2025
Due Date
Jan 30, 2026
Release: Dec 15, 2025
Close: Jan 30, 2026
The City of Greenacres, FL is soliciting bids for renovation work at Fire Rescue Station 95, covering architectural, mechanical, electrical, and fire protection plan revisions and related construction services. A non‑mandatory pre‑bid conference is scheduled for 2025‑12‑30 via Microsoft Teams, and the bid opened on 2025‑12‑15 and closes on 2026‑01‑30 at 3:00 PM Eastern. This is an Invitation for Bid (construction) and not a grant.
Work includes renovation of the fire station.
Posted Date
Dec 4, 2025
Due Date
Jan 20, 2026
Release: Dec 4, 2025
Close: Jan 20, 2026
Work includes renovation of the fire station.
AvailableCity of Kingsland solicits sealed proposals for renovation and modernization of Fire Station #3 (595 E. King Ave, Kingsland, GA). Single-prime, stipulated-price construction contract for interior, exterior, and systems improvements. Mandatory pre-bid meeting required. Submissions are hard-copy only (one original + three copies; price in separate sealed envelope). Significant insurance and builder's risk requirements; E-Verify affidavit, signed W-9, and Certificate of Insurance required. Must comply with OSHA and federal/state EEO requirements.
Posted Date
Dec 2, 2025
Due Date
Jan 20, 2026
Release: Dec 2, 2025
Close: Jan 20, 2026
City of Kingsland solicits sealed proposals for renovation and modernization of Fire Station #3 (595 E. King Ave, Kingsland, GA). Single-prime, stipulated-price construction contract for interior, exterior, and systems improvements. Mandatory pre-bid meeting required. Submissions are hard-copy only (one original + three copies; price in separate sealed envelope). Significant insurance and builder's risk requirements; E-Verify affidavit, signed W-9, and Certificate of Insurance required. Must comply with OSHA and federal/state EEO requirements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis