Summary
Construction of booster pump station. Work under contract 2025-01a involves but is not limited to the following scope of work: a) site work necessary to install improvements. B) installation of a new public drinking water booster pump station. C) installation of new pumps, piping, valves, trolley system, and vfd. Pumps, control valves and vfd to be supplied by owner. D) installation of site piping, fencing, valves, access ways, and other site appurtenances. E) construction of new ductile iron pipe extensions to connect to existing facilities. Work under electrical contract 2025-01b includes but not limited to: a) installation of panel boards, disconnected switches, control panels, instrumentation, generator, and any other electrical equipment specified in division 16. B) connection of all cables and conduits to the specific destinations shown on contract drawings. See attached file.