Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Fence replacement project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
SacSewer seeks contractors to remove and replace the X09 Outfall electrical switchgear at the EchoWater Resource Recovery Facility: supply, install, and integrate new switchgear compatible with existing Distributed Control System (DCS) transfer controls. Project is a public works construction contract (prevailing wages) with DIR registration required, C-10 Electrical Contractor license, 10% bid bond, and 100% performance and payment bonds; Engineer's estimate $1,500,000; mandatory pre-bid/site visit and standard submittal and insurance requirements apply.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
Close: Jan 8, 2026
Premium
Access the largest public sector contact database
SacSewer seeks contractors to remove and replace the X09 Outfall electrical switchgear at the EchoWater Resource Recovery Facility: supply, install, and integrate new switchgear compatible with existing Distributed Control System (DCS) transfer controls. Project is a public works construction contract (prevailing wages) with DIR registration required, C-10 Electrical Contractor license, 10% bid bond, and 100% performance and payment bonds; Engineer's estimate $1,500,000; mandatory pre-bid/site visit and standard submittal and insurance requirements apply.
Roof replacement project. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Roof replacement project. See attached file.
AvailableThe project includes complete replacement of approx. 15,000 LF of inner and outer perimeter fencing, including line posts, fence fabric, razor ribbon, vehicular and pedestrian gates, and footings. The scope also includes new concrete walkways along the interior fence and the replacement of gates located within 30 F of the inner perimeter fence.
Posted Date
May 9, 2025
Due Date
Dec 22, 2025
Release: May 9, 2025
Close: Dec 22, 2025
The project includes complete replacement of approx. 15,000 LF of inner and outer perimeter fencing, including line posts, fence fabric, razor ribbon, vehicular and pedestrian gates, and footings. The scope also includes new concrete walkways along the interior fence and the replacement of gates located within 30 F of the inner perimeter fence.
AvailableRoof replacement project. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Roof replacement project. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis