Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project involves minor debris removal, sidewalk replacement and rip-rap construction in two (2) locations in the Township. The project also consists of the removal and in-kind replacement of a 77" x 52" arch corrugated metal culvert (CMP) across Road in the Township of West Caldwell. Other work associated with the CMP replacement consists of reconnecting existing RCP piping to the proposed culvert, sanitary sewer upgrades, sidewalk and curb replacement, rip-rap construction, inlet upgrades, and pavement restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction for a FEMA Utility Distribution Line Hardening Project.
Posted Date
Jan 23, 2026
Due Date
Feb 18, 2026
Release: Jan 23, 2026
Close: Feb 18, 2026
Construction for a FEMA Utility Distribution Line Hardening Project.
AvailableThe work involves replacement of the existing main with approx. 1200 LF of new water piping, including replacement of existing service laterals and installation of new fire hydrants. See attached files.
Posted Date
Jan 6, 2026
Due Date
Mar 5, 2026
Release: Jan 6, 2026
Close: Mar 5, 2026
The work involves replacement of the existing main with approx. 1200 LF of new water piping, including replacement of existing service laterals and installation of new fire hydrants. See attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis