Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Extending the existing elevated metal boardwalk trail approximately 340 ft through swamp. Woody vegetation obstructing the trail's path would be removed. Viewing platforms will be added on this portion of the boardwalk.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Boardwalk and retaining wall repairs. Replace 800 SF of 2"-thick x 6"-wide pressure-treated boardwalk, replace 1,120 SF of 2"-thick x 6"-wide pressure-treated boardwalk. Replace 201 CF of retaining wall. See attached file.
Posted Date
Dec 1, 2025
Due Date
Jan 14, 2026
Release: Dec 1, 2025
Close: Jan 14, 2026
Boardwalk and retaining wall repairs. Replace 800 SF of 2"-thick x 6"-wide pressure-treated boardwalk, replace 1,120 SF of 2"-thick x 6"-wide pressure-treated boardwalk. Replace 201 CF of retaining wall. See attached file.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Selling a 34 x 54 white oak tree.
Posted Date
Dec 18, 2025
Due Date
Jan 28, 2026
Release: Dec 18, 2025
Close: Jan 28, 2026
Selling a 34 x 54 white oak tree.
AvailableThe City of Oak Forest seeks a qualified forestry consultant to perform a professional tree inventory and develop a citywide tree management plan. The work will guide maintenance, planning, and management of the city’s urban forest resources. Proposals are due February 2, 2026 at 10:00 AM Central Time.
Posted Date
-
Due Date
Feb 2, 2026
Close: Feb 2, 2026
The City of Oak Forest seeks a qualified forestry consultant to perform a professional tree inventory and develop a citywide tree management plan. The work will guide maintenance, planning, and management of the city’s urban forest resources. Proposals are due February 2, 2026 at 10:00 AM Central Time.
AvailableProject will develop a series of elevated overnight camping structures and a central shower house facility at the elongated headlands located between mary jane thurston state park's existing rv/tent campsites, and the large, wooded wetland area of the park s center parcel. Structures will include five rustic dry cabins, three camping platforms, a 3- story restroom and shower house facility with a roof top observation deck for the park to share, and an elevated boardwalk deck connecting all the structures. Additionally, the project will include a ground level natural play area, and an integrated play structure equipped with climbing nets, net bridges, and a slide.
Posted Date
Dec 5, 2025
Due Date
Jan 27, 2026
Release: Dec 5, 2025
Close: Jan 27, 2026
Project will develop a series of elevated overnight camping structures and a central shower house facility at the elongated headlands located between mary jane thurston state park's existing rv/tent campsites, and the large, wooded wetland area of the park s center parcel. Structures will include five rustic dry cabins, three camping platforms, a 3- story restroom and shower house facility with a roof top observation deck for the park to share, and an elevated boardwalk deck connecting all the structures. Additionally, the project will include a ground level natural play area, and an integrated play structure equipped with climbing nets, net bridges, and a slide.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →