Retrieving RFP details
Release
Close
Essex North Shore Agricultural and Technical School District
Expansion of the existing building at gallant hall with a new 1500 SF per floor, two story building.
City of Daytona Beach
Design-build of a two-story addition to the existing city hall building. It will include 17,500 SF of space per floor, for a total of 35,000 SF. Once completed, this addition will add approximately 50 percent more area to the facility.
Goshen Medical Center
General contractor (fixed price) and construction general contractor (cost-plus) for 5,576 SF building.
Durham County Utilities Administration Building
Project consists of two, single-story buildings. The utility admin building 26,888 SF glulam structure with CMU exterior walls with face brick and metal wall panels, full fire protection and MEP. The second building is a warehouse, 9.145 SF steel-framed structure with CMU exterior walls with face brick and metal wall panels, full fire protection and MEP. Bid Packages to Prequalify includes epoxy, visual display security, access control, and, video, audio visual.
Release
Oct 29, 2025
Close
Nov 19, 2025