Summary
Site clearing and preparation; underdrain work with associated rip rap, shoulder construction, and separation fabric; removal and re-installation of guiderail and signs; traffic control; erosion and sedimentation control measures; existing utility protection; road reconstruction, including, but not limited to, the removal of existing bituminous paving and subbase and replacement with imported competent material, aggregate subbase, and bituminous pavement; bituminous milling and overlay with wedge curb; and miscellaneous site restoration, complete in place. Alternative Bid – Road Reconstruction with Tensar HX-165 Geogrid (Or Approved Equal). The project includes, but is not limited to, site clearing and preparation; underdrain work with associated rip rap, shoulder construction, and separation fabric; removal and re-installation of guiderail and signs; traffic control; erosion and sedimentation control measures; existing utility protection; road reconstruction, including, but not limited to, the removal of existing bituminous paving and subbase and replacement with Tensar HX-165 Geogrid, aggregate subbase and bituminous pavement with wedge curb; bituminous milling and overlay; and miscellaneous site restoration, complete in place.