Summary
The selected environmental consulting firm will provide all tools, equipment, testing instruments, safety equipment, and labor necessary to perform the tasks described in this proposal. The environmental
consulting firm shall timely and closely coordinate with the WMP to schedule dates for ingress and egress and access to the properties to complete the tasks described below. The selected environmental consulting firm will be responsible for work as described in the Scope of Services below to meet the following objectives:
Install 12 gas monitoring probes along the east side of the Stone Canyon Golf Club to detect any potential landfill gas migration that is occurring in this portion of the Woods Chapel and Jackson
County Sanitary Landfills. The gas monitoring probes will be installed at three designated locations as nested probes or four individual probes to monitor the required geologic groups or
formations (see Appendices C and D). Construct and install gas monitoring probes per the project scope of services to ensure all
geologic pathways are capable of being monitored for the presence of methane gas and probes are secured to protect their integrity. The probes will be installed according to Missouri Well Construction Rules, 10 CSR 23. Ensure all ingress and egress routes to gas monitoring probe locations and the construction of probes are completed with minimal impact to the golf course and adjacent school properties. After the probes are installed and completed, survey the location of the probes and prepare and submit a construction quality assurance report of installation to the WMP that includes boring
logs and as-built drawings for each probe.