Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Hillsborough Transit Authority (HART) issued RFP #RFP54203 seeking a systems integrator to furnish, install, configure, operate, and maintain solar-powered real-time digital information displays at a minimum of 85 bus stop locations across Hillsborough and Pasco Counties, integrating with HART's Swiftly AVL system. Proposals are due January 12, 2026; the procurement is for a five-year IDIQ contract with detailed installation, testing, maintenance, and federal compliance requirements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide technology operational experimentation events (TOEE) 26 experimentation campaign focused on emerging technologies.
Posted Date
Nov 18, 2025
Due Date
Dec 19, 2025
Release: Nov 18, 2025
Close: Dec 19, 2025
Provide technology operational experimentation events (TOEE) 26 experimentation campaign focused on emerging technologies.
AvailablePremium
Access the largest public sector contact database
Qualified firms to conduct a bus stop placement & amenities study.
Posted Date
Dec 2, 2025
Due Date
Jan 20, 2026
Release: Dec 2, 2025
Close: Jan 20, 2026
Qualified firms to conduct a bus stop placement & amenities study.
AvailableProvide fire control solutions supporting existing and emerging DEVCOM-AC weapon systems.
Posted Date
Dec 18, 2020
Due Date
Dec 17, 2025
Release: Dec 18, 2020
Close: Dec 17, 2025
Provide fire control solutions supporting existing and emerging DEVCOM-AC weapon systems.
AvailableNHCOG seeks a consultant to perform a Bus Stop Placement & Amenities Study for the Northwest Connecticut Transit District (four fixed routes between Torrington and Winsted) and the CTDOT Express route segment in the NHCOG region. Scope includes field inventory and condition assessment, static (and optional GIS) mapping, infrastructure and amenity recommendations (shelters, benches, accessible boarding areas, signage), stop location analysis (relocation/consolidation/new stops), stakeholder engagement (rider surveys, CTDOT coordination, ≥2 public meetings), and a phased implementation plan with cost estimates. Deliverables: static map, condition assessment with photos, draft/final recommendations, implementation plan, and stakeholder documentation. Required capabilities: transit planning experience, GIS capability preferred, ability to lead engagement, provide itemized budget, references for comparable projects, DBE participation, and meet insurance/indemnification requirements; sealed hard-copy submission plus thumb drive.
Posted Date
Dec 1, 2025
Due Date
Jan 20, 2026
Release: Dec 1, 2025
Close: Jan 20, 2026
NHCOG seeks a consultant to perform a Bus Stop Placement & Amenities Study for the Northwest Connecticut Transit District (four fixed routes between Torrington and Winsted) and the CTDOT Express route segment in the NHCOG region. Scope includes field inventory and condition assessment, static (and optional GIS) mapping, infrastructure and amenity recommendations (shelters, benches, accessible boarding areas, signage), stop location analysis (relocation/consolidation/new stops), stakeholder engagement (rider surveys, CTDOT coordination, ≥2 public meetings), and a phased implementation plan with cost estimates. Deliverables: static map, condition assessment with photos, draft/final recommendations, implementation plan, and stakeholder documentation. Required capabilities: transit planning experience, GIS capability preferred, ability to lead engagement, provide itemized budget, references for comparable projects, DBE participation, and meet insurance/indemnification requirements; sealed hard-copy submission plus thumb drive.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis