Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Taylor
Removal and installation of a new furnace with humidifier and condensate pump to match or exceed existing BTUH output and size. (approx., 65,000 BTU) the existing furnace is on the first floor and is an up-flow furnace the existing furnace is to be removed and replaced with a new 95% or better energy efficient furnace and installed to current code. The existing ductwork is to be cleaned and balanced once the new furnace is installed to eliminate existing cold spots in the house. Remove and replace the existing 3 ton air conditioning condenser with a new 2 ton unit 13 seer with matching case coil reconnect all ductwork, electrical and gas piping.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Denton Township
Replacement of 1993 trane furnace.
Posted Date
Oct 29, 2025
Due Date
Dec 1, 2025
Release: Oct 29, 2025
Denton Township
Close: Dec 1, 2025
Replacement of 1993 trane furnace.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
DSC Contracting Services Division
Rehabilitate, replace, and upgrade various components of the deteriorating water and wastewater system. Wastewater system work will include replacing service laterals, correcting pressured force mains and gravity sewer mains, as well as repairing or replacing the manholes and pump stations.
Posted Date
Aug 27, 2025
Due Date
Dec 30, 2025
Release: Aug 27, 2025
DSC Contracting Services Division
Close: Dec 30, 2025
Rehabilitate, replace, and upgrade various components of the deteriorating water and wastewater system. Wastewater system work will include replacing service laterals, correcting pressured force mains and gravity sewer mains, as well as repairing or replacing the manholes and pump stations.
AvailableAnderson School District 1
Replacement of existing 3-ton split systems and gas furnace units.
Posted Date
Nov 5, 2025
Due Date
Nov 19, 2025
Release: Nov 5, 2025
Anderson School District 1
Close: Nov 19, 2025
Replacement of existing 3-ton split systems and gas furnace units.
AvailableBorough of Eatontown
Rehab Program Administrator.
Posted Date
Oct 21, 2025
Due Date
Nov 18, 2025
Release: Oct 21, 2025
Borough of Eatontown
Close: Nov 18, 2025
Rehab Program Administrator.