Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Anderson School District 1
Replacement of existing 3-ton split systems and gas furnace units.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Commission on Economic Opportunity (CEO)
Furnace and Boiler Replacement Heating System Maintenance and Improvement.
Posted Date
-
Due Date
Nov 19, 2025
Commission on Economic Opportunity (CEO)
Close: Nov 19, 2025
Furnace and Boiler Replacement Heating System Maintenance and Improvement.
AvailableDenton Township
Replacement of 1993 trane furnace.
Posted Date
Oct 29, 2025
Due Date
Dec 1, 2025
Release: Oct 29, 2025
Denton Township
Close: Dec 1, 2025
Replacement of 1993 trane furnace.
AvailableCity of Taylor
Removal and installation of a new furnace with humidifier and condensate pump to match or exceed existing BTUH output and size. (approx., 65,000 BTU) the existing furnace is on the first floor and is an up-flow furnace the existing furnace is to be removed and replaced with a new 95% or better energy efficient furnace and installed to current code. The existing ductwork is to be cleaned and balanced once the new furnace is installed to eliminate existing cold spots in the house. Remove and replace the existing 3 ton air conditioning condenser with a new 2 ton unit 13 seer with matching case coil reconnect all ductwork, electrical and gas piping.
Posted Date
Nov 12, 2025
Due Date
Nov 18, 2025
Release: Nov 12, 2025
City of Taylor
Close: Nov 18, 2025
Removal and installation of a new furnace with humidifier and condensate pump to match or exceed existing BTUH output and size. (approx., 65,000 BTU) the existing furnace is on the first floor and is an up-flow furnace the existing furnace is to be removed and replaced with a new 95% or better energy efficient furnace and installed to current code. The existing ductwork is to be cleaned and balanced once the new furnace is installed to eliminate existing cold spots in the house. Remove and replace the existing 3 ton air conditioning condenser with a new 2 ton unit 13 seer with matching case coil reconnect all ductwork, electrical and gas piping.
Osceola County
Provide and install five (5) new commercial split-system hvac units as replacements for five (5) existing commercial split-system hvac units, project requires removal and disposal of five (5) existing in-use commercial split-system hvac units; and the provision and installation of five (5) new commercial split-system hvac units.
Posted Date
Oct 19, 2025
Due Date
Nov 18, 2025
Release: Oct 19, 2025
Osceola County
Close: Nov 18, 2025
Provide and install five (5) new commercial split-system hvac units as replacements for five (5) existing commercial split-system hvac units, project requires removal and disposal of five (5) existing in-use commercial split-system hvac units; and the provision and installation of five (5) new commercial split-system hvac units.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis