Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Brooks City-Base (Brooks Development Authority)
Embassy suites exterior wall recladding.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Los Angeles Unified School District
Building a & b - project to remove and replace all tiles and substrate for exterior areas that includes tiles, redgard water proofing, mortar bed, lath, plaster, control joints, expansion joints and other metal trim associated with the tile assembly. Remove and replace flashing, parapet coping and bird deterrent. Remove and reinstall cctvs, pa speaker and light fixture on the exterior wall.
Posted Date
Jul 1, 2025
Due Date
Dec 9, 2025
Release: Jul 1, 2025
Los Angeles Unified School District
Close: Dec 9, 2025
Building a & b - project to remove and replace all tiles and substrate for exterior areas that includes tiles, redgard water proofing, mortar bed, lath, plaster, control joints, expansion joints and other metal trim associated with the tile assembly. Remove and replace flashing, parapet coping and bird deterrent. Remove and reinstall cctvs, pa speaker and light fixture on the exterior wall.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
New York State University Construction Fund
The State University Construction Fund seeks statements of qualifications from firms to provide Construction Manager (CM) Agency — Construction Phase Services to repair chronic leaks at the exterior walls of the Medical Research Translation (MART) building at SUNY Stony Brook. The project is an eight-story (~240,000 GSF) building with an estimated construction duration of 51 months and an estimated construction budget of approximately $70,697,000.
Posted Date
-
Due Date
Dec 9, 2025
New York State University Construction Fund
Close: Dec 9, 2025
The State University Construction Fund seeks statements of qualifications from firms to provide Construction Manager (CM) Agency — Construction Phase Services to repair chronic leaks at the exterior walls of the Medical Research Translation (MART) building at SUNY Stony Brook. The project is an eight-story (~240,000 GSF) building with an estimated construction duration of 51 months and an estimated construction budget of approximately $70,697,000.
AvailablePaiute Indian Tribe of Utah
Project includes remove existing stucco, foam and existing rock around exterior perimeter to expose exterior stud wall, remove all exterior windows and provide windows with installation of low e aluminum frame glass windows, remove all exterior doors and replace them with aluminum store front doors, provide material and install OSB around entire exterior wall, provide material and install exterior vapor barrier around exterior perimeter, provide material and install 3 (three) foot brick veneer around entire exterior perimeter, provide material and install transition cap for brick veneer to metal siding transition, install metal siding around exterior perimeter.
Posted Date
Nov 21, 2025
Due Date
Dec 20, 2025
Release: Nov 21, 2025
Paiute Indian Tribe of Utah
Close: Dec 20, 2025
Project includes remove existing stucco, foam and existing rock around exterior perimeter to expose exterior stud wall, remove all exterior windows and provide windows with installation of low e aluminum frame glass windows, remove all exterior doors and replace them with aluminum store front doors, provide material and install OSB around entire exterior wall, provide material and install exterior vapor barrier around exterior perimeter, provide material and install 3 (three) foot brick veneer around entire exterior perimeter, provide material and install transition cap for brick veneer to metal siding transition, install metal siding around exterior perimeter.
AvailableNJ Division of Property Management & Construction
Project is for the selective removal of the existing wood siding from the nature center to remove and replace damaged sheathing and sister the existing wall framing as required. Rehabilitation of the existing exterior windows is also included to provide a weathertight construction.
Posted Date
Oct 24, 2025
Due Date
Dec 11, 2025
Release: Oct 24, 2025
NJ Division of Property Management & Construction
Close: Dec 11, 2025
Project is for the selective removal of the existing wood siding from the nature center to remove and replace damaged sheathing and sister the existing wall framing as required. Rehabilitation of the existing exterior windows is also included to provide a weathertight construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →