Summary
Work consist of removal of the existing switchgear/transformer foundation, 6 bus pedestal foundations, the existing fence and conduit where conflicts occur. Concrete work is required for the transformer, switchgear, security poles, fence curbing and modifications to the existing circuit switcher foundation. Oversite of delivery of the switchgear and transformer, anchoring of transformer to the pad, all bus work, site grading, stormwater, new conduit, grounding, lighting, high security fence, pulling of power and control wiring as well as labeling of conduit and cable will be the part of this contract. New substation top rock and lava rock will be required.