Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Invitation for bids for construction rehabilitation of the sedimentation basins at El Pico Water Treatment Plant (Laredo, TX). Public works construction requiring a bid bond equal to 5% of the total bid; payment bond required (100% if > $50,000) and performance bond required (100% if > $100,000). Electronic submission via Cit-E-Bid required; pre-bid meeting strongly encouraged.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Work includes 220 LF replacement of vertical joint filler/sealant (interior), 220 LF replacement of vertical joint filler/sealant (exterior), 2,115 LF interface sealant system (floor and fillet) (combiflex or approved equal)(interior), 57,968 SF surface coating of interior floor and walls, 1 LS temporary bypassing of the settled water channel, 15,605 EA exterior aesthetic coat/painting, 6,000 SF thin cementitious re-surfacer for exposed aggregate on the concrete floor (as directed). See outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 8, 2026
Release: Dec 3, 2025
Close: Jan 8, 2026
Work includes 220 LF replacement of vertical joint filler/sealant (interior), 220 LF replacement of vertical joint filler/sealant (exterior), 2,115 LF interface sealant system (floor and fillet) (combiflex or approved equal)(interior), 57,968 SF surface coating of interior floor and walls, 1 LS temporary bypassing of the settled water channel, 15,605 EA exterior aesthetic coat/painting, 6,000 SF thin cementitious re-surfacer for exposed aggregate on the concrete floor (as directed). See outside link.
AvailablePurchase of water treatment plant chemicals for the year 2026
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Close: Dec 17, 2025
Purchase of water treatment plant chemicals for the year 2026
AvailableProvide wastewater treatment plant aeration basin rehabilitation and grit system replacement. The aeration basin air system requires a full rehabilitation. The scope of work includes: dewatering, removing and disposing the accumulated sludge, and cleaning all four cells of the aeration basin; complete replacement of all air distribution system in all four cells of the aeration basin. Once initial cleaning is complete, all remaining metal piping, fittings, and valves from the blowers to the new joints on the drop pipes in the aeration basin will be blast-cleaned and repainted. Due to the current inaccessibility of the filled cells, additional repairs to pedestals, tank walls, and floors may be required. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Release: Nov 19, 2025
Close: Dec 19, 2025
Provide wastewater treatment plant aeration basin rehabilitation and grit system replacement. The aeration basin air system requires a full rehabilitation. The scope of work includes: dewatering, removing and disposing the accumulated sludge, and cleaning all four cells of the aeration basin; complete replacement of all air distribution system in all four cells of the aeration basin. Once initial cleaning is complete, all remaining metal piping, fittings, and valves from the blowers to the new joints on the drop pipes in the aeration basin will be blast-cleaned and repainted. Due to the current inaccessibility of the filled cells, additional repairs to pedestals, tank walls, and floors may be required. See attached file.
AvailableWork consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
Posted Date
Nov 20, 2025
Due Date
Jan 19, 2026
Release: Nov 20, 2025
Close: Jan 19, 2026
Work consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis