Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Eighth avenue sewer rehabilitation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Phoenix requests qualifications for engineering services for the Northern Avenue Sewer Relief project, including corridor/alignment study, design, construction administration, inspection, and utility coordination. The work will include sewer capacity analysis, right-of-way/easement coordination, surveys, public information services, and preparation of design and construction documents for replacement of existing sewer lines. The estimated construction cost is approximately $7.4 million and qualifications must be submitted via the City's procurement portal.
Posted Date
Nov 20, 2025
Due Date
Dec 12, 2025
Release: Nov 20, 2025
Close: Dec 12, 2025
The City of Phoenix requests qualifications for engineering services for the Northern Avenue Sewer Relief project, including corridor/alignment study, design, construction administration, inspection, and utility coordination. The work will include sewer capacity analysis, right-of-way/easement coordination, surveys, public information services, and preparation of design and construction documents for replacement of existing sewer lines. The estimated construction cost is approximately $7.4 million and qualifications must be submitted via the City's procurement portal.
Premium
Access the largest public sector contact database
Release: Dec 5, 2025
Close: Jan 8, 2026
Sewer main rehabilitation project.
AvailableWork on the avenue sewer main lining consists of mobilization, 915 LF of pre-installation cleaning and video inspection of the sanitary sewer main, furnishing and installing 915 LF of CIPP liner, 52 vertical feet of multi-layer "stress-skin panel" liner system. Add alternate schedule 1 is as follows: 211 LF of pre-installation of cleaning and video of sanitary sewer laterals, furnish and installing a CIPP liner for the 8 laterals, installation of eight (8) 6" lateral cleanouts with sanitary sewer cleanout frames and covers.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Work on the avenue sewer main lining consists of mobilization, 915 LF of pre-installation cleaning and video inspection of the sanitary sewer main, furnishing and installing 915 LF of CIPP liner, 52 vertical feet of multi-layer "stress-skin panel" liner system. Add alternate schedule 1 is as follows: 211 LF of pre-installation of cleaning and video of sanitary sewer laterals, furnish and installing a CIPP liner for the 8 laterals, installation of eight (8) 6" lateral cleanouts with sanitary sewer cleanout frames and covers.
AvailableProject consists of the repair, rehabilitation, or replacement of 1,270 LF (0.24 miles) of defective sewer mains; 856 LF (0.16 miles) of defective sewer laterals, and ten (10) manholes.
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
Close: Dec 16, 2025
Project consists of the repair, rehabilitation, or replacement of 1,270 LF (0.24 miles) of defective sewer mains; 856 LF (0.16 miles) of defective sewer laterals, and ten (10) manholes.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis