Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a 2. 5-million-gallon composite elevated water reservoir, foundation and soil improvements; site grading and surfacing; installation of water, electrical power, telecommunications, irrigation, and stormwater utilities; landscaping and installation of security fencing, gates and surveillance equipment, site improvements and other work. Site grading and earthwork 1 ls, de watering 1 ls, demolition and tree removal 1 ls, site grading and earthwork 1 ls, access driveway 1 ls, perimeter fence and gate 1 ls, site utilities 1 ls, landscaping and irrigation 1 ls, CFA pile system 1 ls, additional CFA pile length 500 lf, additional grout/concrete 100 cy, coring and back filings piles. See attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Dec 5, 2025
Close: Jan 15, 2026
Elevated water storage tank.
AvailableThe City of Leesburg, Florida, is seeking proposals for an Elevated Water Tank Rehabilitation Project. This invitation for bids (IFB 250701) was posted on December 1, 2025, with bids due by January 14, 2026.
Posted Date
Dec 1, 2025
Due Date
Jan 14, 2026
Release: Dec 1, 2025
Close: Jan 14, 2026
The City of Leesburg, Florida, is seeking proposals for an Elevated Water Tank Rehabilitation Project. This invitation for bids (IFB 250701) was posted on December 1, 2025, with bids due by January 14, 2026.
AvailableWork includes construction of a 2,000,000 gal composite or steel elevated water storage tank (EWST) and associated site improvements, grading, concrete, paving, maintenance of traffic, erosion and sediment control, electrical, instrumentation, and approx. 2,800 LF of 16" dia ductile iron water mains.
Posted Date
Dec 3, 2025
Due Date
Jan 20, 2026
Release: Dec 3, 2025
Close: Jan 20, 2026
Work includes construction of a 2,000,000 gal composite or steel elevated water storage tank (EWST) and associated site improvements, grading, concrete, paving, maintenance of traffic, erosion and sediment control, electrical, instrumentation, and approx. 2,800 LF of 16" dia ductile iron water mains.
AvailableRemote in-service cleaning and inspection of the 45 mg finished water reservoir.
Posted Date
Nov 24, 2025
Due Date
Dec 19, 2025
Release: Nov 24, 2025
Close: Dec 19, 2025
Remote in-service cleaning and inspection of the 45 mg finished water reservoir.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis