Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of extend the use path, improve lighting, signage, and striping for high-t merge, and evaluate and install safety enhancements at six pedestrian crossing locations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Perform a safety audit of its field operations division, perform observations and analysis, and provide recommendations based on industry standard best practices, by submitting a written report to the division.
Posted Date
Sep 12, 2025
Due Date
Dec 12, 2025
Release: Sep 12, 2025
Close: Dec 12, 2025
Perform a safety audit of its field operations division, perform observations and analysis, and provide recommendations based on industry standard best practices, by submitting a written report to the division.
Premium
Access the largest public sector contact database
Provide safety training and certification procedures, vehicle and infrastructure inspections, and forensic analysis of thermal events. These analysis and procedures shall include vehicles powered by cng, lng, and electricity, alongside their associated support infrastructure.
Posted Date
Nov 3, 2025
Due Date
Dec 19, 2025
Release: Nov 3, 2025
Close: Dec 19, 2025
Provide safety training and certification procedures, vehicle and infrastructure inspections, and forensic analysis of thermal events. These analysis and procedures shall include vehicles powered by cng, lng, and electricity, alongside their associated support infrastructure.
AvailableCharlotte Water seeks a consultant to conduct a comprehensive safety audit of its Field Operations Division, including observations, analysis, and recommendations based on industry best practices. Proposals must be submitted via the City of Charlottes Bonfire portal by December 12, 2025 at 2:00 PM EST.
Posted Date
Nov 12, 2025
Due Date
Dec 12, 2025
Release: Nov 12, 2025
Close: Dec 12, 2025
Charlotte Water seeks a consultant to conduct a comprehensive safety audit of its Field Operations Division, including observations, analysis, and recommendations based on industry best practices. Proposals must be submitted via the City of Charlottes Bonfire portal by December 12, 2025 at 2:00 PM EST.
This project includes repairs to the eastern 13.5 miles of Canyon Road as well as embankment repair and riprap installation at the Falls Canyon Trailhead parking area. Canyon Road is a remote road intended for high-clearance vehicular access only. This project will restore the roadway from previous flooding damage and provide enhancements to minimize major damage from future flooding.
Posted Date
Dec 10, 2025
Due Date
Jan 28, 2026
Release: Dec 10, 2025
Close: Jan 28, 2026
This project includes repairs to the eastern 13.5 miles of Canyon Road as well as embankment repair and riprap installation at the Falls Canyon Trailhead parking area. Canyon Road is a remote road intended for high-clearance vehicular access only. This project will restore the roadway from previous flooding damage and provide enhancements to minimize major damage from future flooding.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis