Summary
The Defense Logistics Agency (Defense Supply Center Richmond) is soliciting quotes to replace the existing oil-fired boiler system at the DSCR B150 ARNG facility with a new dual-fuel (oil/natural gas) boiler system; the contractor will remove and dispose of the existing system and furnish, install, and commission the new system. The procurement is issued as RFQ SP4703-26-Q-0061, is a firm-fixed-price project set aside 100% for small businesses, and uses a lowest-priced technically acceptable (LPTA) award approach with an expected 270-day period of performance. Site visit and questions are scheduled in late July and quotes are due August 12, 2026 (end of day); SAM registration is required prior to award and Department of Labor wage determinations apply.