Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The pier is approx. 540' long x 80' wide, and was rehabilitated and converted into a park in 2011. The pier substructure consists of timber bent lines (numbered west to east, or inshore to outshore) with numerous timber piles and a timber cap. The very end few bays of the pier is a standard timber low deck configuration, with deck planks and a seawall above the bents. The remaining portion and majority of the pier consists of steel trusses (vertical and diagonal I-beams) with top and bottom chords (back-to-back channels) that are supported by the timber cap beams, and a concrete deck above.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Fishing Pier Rehabilitation Project. This project includes the removal and replacement of six (6) damaged timber piles and their associated stringers; all timber decking board.
Posted Date
Jan 27, 2026
Due Date
Feb 26, 2026
Release: Jan 27, 2026
Close: Feb 26, 2026
Fishing Pier Rehabilitation Project. This project includes the removal and replacement of six (6) damaged timber piles and their associated stringers; all timber decking board.
AvailableProcurement of construction services for the removal and disposal of an existing fishing pier, including related structures and utilities, and site repair, for the Sunset Point Fishing Pier, Handicap Pier, and Site Repair Project.
Posted Date
Jan 21, 2026
Due Date
Feb 25, 2026
Release: Jan 21, 2026
Close: Feb 25, 2026
Procurement of construction services for the removal and disposal of an existing fishing pier, including related structures and utilities, and site repair, for the Sunset Point Fishing Pier, Handicap Pier, and Site Repair Project.
AvailableThe work of this contract consists of removal and lawful disposal of the existing fishing pier inclusive of piles, deck and structure, shelter, roof, lighting, conduits and conductors, water piping, benches, concrete bulk debris, concrete ramp, capping onshore buried utilities, and all miscellaneous and supporting items of work.
Posted Date
Jan 9, 2026
Due Date
Feb 25, 2026
Release: Jan 9, 2026
Close: Feb 25, 2026
The work of this contract consists of removal and lawful disposal of the existing fishing pier inclusive of piles, deck and structure, shelter, roof, lighting, conduits and conductors, water piping, benches, concrete bulk debris, concrete ramp, capping onshore buried utilities, and all miscellaneous and supporting items of work.
AvailableEngineering services for pier repairs, covering bid specification development and construction phase support.
Posted Date
Jan 9, 2026
Due Date
Feb 1, 2026
Release: Jan 9, 2026
Close: Feb 1, 2026
Engineering services for pier repairs, covering bid specification development and construction phase support.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis