Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes the following work: the removal of existing drainage infrastructure and installation of a new box culvert. Including elevation of the existing roadway, repaving for the new roadway, and replacement of existing utilities.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the removal of existing drainage infrastructure and installation of a new box culvert across Washington Avenue, including elevation and repaving of the roadway, and replacement of existing utilities.
Posted Date
Dec 14, 2025
Due Date
Jan 21, 2026
Release: Dec 14, 2025
Close: Jan 21, 2026
This RFP is for the removal of existing drainage infrastructure and installation of a new box culvert across Washington Avenue, including elevation and repaving of the roadway, and replacement of existing utilities.
AvailableThis RFP is for the reconstruction of Alcove Avenue from an existing 2-lane section to a proposed 3-lane interim design section, including drainage improvements.
Posted Date
Jan 8, 2026
Due Date
Jan 15, 2026
Release: Jan 8, 2026
Close: Jan 15, 2026
This RFP is for the reconstruction of Alcove Avenue from an existing 2-lane section to a proposed 3-lane interim design section, including drainage improvements.
AvailableProcurement of construction services for the Alcove Avenue Improvements project.
Posted Date
-
Due Date
Feb 2, 2026
Close: Feb 2, 2026
Procurement of construction services for the Alcove Avenue Improvements project.
AvailableWork includes New Detention Pond and drainage channel grading, approximately 250 LF of new Limestone Block Retaining Wall, Concrete and Stone Rip Rap, approximately 180 LF of 24" RCP storm sewer, three (3) 4'x4' Precast Concrete Junction Box, Concrete Headwall, Precast concrete 6:1 safety end treatment, SWPPP installations and traffic control.
Posted Date
Dec 29, 2025
Due Date
Jan 27, 2026
Release: Dec 29, 2025
Close: Jan 27, 2026
Work includes New Detention Pond and drainage channel grading, approximately 250 LF of new Limestone Block Retaining Wall, Concrete and Stone Rip Rap, approximately 180 LF of 24" RCP storm sewer, three (3) 4'x4' Precast Concrete Junction Box, Concrete Headwall, Precast concrete 6:1 safety end treatment, SWPPP installations and traffic control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis