Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
In general, the project consists of the reconstruction of approximately 21,000 SF of concrete sidewalk along Lake Street in downtown Phillips, Wisconsin. The scope of work includes concrete removal, concrete sidewalk placement, colored-stamped concrete boulevard placement, and associated work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Allegan is soliciting construction bids to reconstruct streets and replace utilities (water main, sanitary sewer, and storm sewer) within its downtown on Trowbridge, Walnut, and Chestnut Streets, with an alternate for Grand Street watermain. Work includes roadway reconstruction, curb and gutter, sidewalk, streetscape features, and associated appurtenances. Bids are administered via the City’s engineer (Abonmarche) bid room, with bid opening scheduled for January 26, 2026.
Posted Date
Dec 19, 2025
Due Date
Jan 26, 2026
Release: Dec 19, 2025
Close: Jan 26, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Allegan is soliciting construction bids to reconstruct streets and replace utilities (water main, sanitary sewer, and storm sewer) within its downtown on Trowbridge, Walnut, and Chestnut Streets, with an alternate for Grand Street watermain. Work includes roadway reconstruction, curb and gutter, sidewalk, streetscape features, and associated appurtenances. Bids are administered via the City’s engineer (Abonmarche) bid room, with bid opening scheduled for January 26, 2026.
Reconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
Posted Date
Nov 7, 2025
Due Date
Jan 30, 2026
Release: Nov 7, 2025
Close: Jan 30, 2026
Reconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
AvailableThe City of Shelton, WA is inviting sealed bids for the Downtown Street Tree and Sidewalk Repair project (ITB #26-002-LPW). Work involves removal and replacement of select downtown street trees and associated sidewalk/curb repairs to address uplift and pedestrian safety. Bids open January 8, 2026 and are due by February 3, 2026 at 1:00 PM local time.
Posted Date
Jan 8, 2026
Due Date
Feb 3, 2026
Release: Jan 8, 2026
Close: Feb 3, 2026
The City of Shelton, WA is inviting sealed bids for the Downtown Street Tree and Sidewalk Repair project (ITB #26-002-LPW). Work involves removal and replacement of select downtown street trees and associated sidewalk/curb repairs to address uplift and pedestrian safety. Bids open January 8, 2026 and are due by February 3, 2026 at 1:00 PM local time.
AvailableParking lot/sidewalk reconstruction, including lighting and other incidental work.
Posted Date
Dec 23, 2025
Due Date
Jan 14, 2026
Release: Dec 23, 2025
Close: Jan 14, 2026
Parking lot/sidewalk reconstruction, including lighting and other incidental work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →