Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. 4,870 LF of 6" dip water main(open cut); 3,434 lbs of AWWA C15 dip fittings; 970 LF RJ 6" dip water main; 5,600 LF of silt fence; 622 CY of rock excavation. 1 LS mobilization (3%); 1 EA connect to ex. 10" PVC water line; 4870 LF 6" dip water main (open cut); 726 lf 4" dip water main (open cut); 6 EA new fire hydrant assembly; 1 EA blow off assembly; 10 EA 6" gate valves; 3434 lbs AWWA C153 dip fittings; 970 LF RJ 6" dip water main; 148 LF EJ 4" dip water main; 2 EA new duplex pump station pumps; 1 EA new pump station enclosure; 1 EA new 75k gal stainless steel water tank; 1 EA temporary hydro pneumatic potable water storage tank; 1 EA demolition of existing water tank; 1 EA demolition of existing booster pump station; 1 EA 13kw generator. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of: removal of existing water treatment equipment and installation of new water treatment equipment at four buildings including piping additions, yard piping and surface restoration.
Posted Date
Nov 7, 2025
Due Date
Feb 3, 2026
Release: Nov 7, 2025
Close: Feb 3, 2026
Work consists of: removal of existing water treatment equipment and installation of new water treatment equipment at four buildings including piping additions, yard piping and surface restoration.
AvailableContract #1: Water Distribution System Upgrades that consist of approximately 6,100 LF of 8” PVC, 13,050 LF of 6” PVC, 2,190 LF of 4” PVC, and 2,100 LF of 2” PVC Waterline. The project will also consist of approximately 3,100 LF of various sized customer service line ranging from ¾” to 1-1/2”. Approximately 210 customers will be reconnected, 45 EA Gate Valves ranging in size from 2” to 8” will be installed, 14 EA Fire Hydrants will be installed and all related appurtenances to complete the project. See outside link.
Posted Date
Oct 16, 2025
Due Date
Jan 27, 2026
Release: Oct 16, 2025
Close: Jan 27, 2026
Contract #1: Water Distribution System Upgrades that consist of approximately 6,100 LF of 8” PVC, 13,050 LF of 6” PVC, 2,190 LF of 4” PVC, and 2,100 LF of 2” PVC Waterline. The project will also consist of approximately 3,100 LF of various sized customer service line ranging from ¾” to 1-1/2”. Approximately 210 customers will be reconnected, 45 EA Gate Valves ranging in size from 2” to 8” will be installed, 14 EA Fire Hydrants will be installed and all related appurtenances to complete the project. See outside link.
Work includes: improving north kirkwood road from swan avenue to east adams avenue with new curb, sidewalk, curb ramps, side street residential and commercial entrances, milling of the road surface for a new overlay, pavement marking, new mid-block HAWK signal, storm sewer, and other appurtenances.
Posted Date
Sep 15, 2025
Due Date
Jan 23, 2026
Release: Sep 15, 2025
Close: Jan 23, 2026
Work includes: improving north kirkwood road from swan avenue to east adams avenue with new curb, sidewalk, curb ramps, side street residential and commercial entrances, milling of the road surface for a new overlay, pavement marking, new mid-block HAWK signal, storm sewer, and other appurtenances.
AvailableEngineering services in connection with the stillwagon road water improvements project.
Posted Date
Nov 27, 2025
Due Date
Jan 9, 2026
Release: Nov 27, 2025
Close: Jan 9, 2026
Engineering services in connection with the stillwagon road water improvements project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis