Summary
This project consists of 5 separate buildings. Scope of work includes the existing shingle removal down to deck and installation of new metal panel roof system of 3 roofs (A, C & E), flute fill and PVC overlay of 1 roof (D), removal and replacement of 1 awning and the demolition of 1 canopy (J). BUILDINGS 'A', 'C' & 'E' 1. Remove existing roofing and underlayment to decking of 3 separate structures (A, C&E). 2. Remove & replace any damaged / deteriorated roof decking of roofs. 3. Remove existing gutters and downspouts on all buildings. 4. Install new ice and water shield at perimeters and penetrations of roofs. 5. Install new underlayment, metal roof panels and components on all roofs. 6. Install new gutters, downspouts, valleys and trim where indicated on drawings. Building ‘D’ 1. New PVC roofing membrane & “flute filler” rigid insulation installed over existing metal panel roof systems. a. Clean roof surfaces b. Loose lay rigid Isocyanate insulation between roof panel ribs c. Loose lay HD Iso cover board insulation over entire roof d. Mechanically fasten both layers of insulation to existing metal roof structure. e. Mechanically attach .060 PVC membrane roof over insulation. f. Install all PVC flashings and metal components to complete the installation. g. Install new pre-finished gutters and downspouts. BUILDING 'J' 1. Demolish rear canopy structures & front awning structure, install new awning structure in front.