Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Sugar Land is soliciting sealed bids for the Ditch H Trail / Sugar Land Trail Phase I civil engineering construction project to furnish all labor, materials, and equipment for approximately 3.2 miles of multiuse trail, bridges, retaining walls, and related work. Bids are due December 4, 2025 at 11:00 AM Central; the posting is active, not a grant, and is posted by a non-federal (city) buyer.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Trail phase 2 project.
Posted Date
Nov 24, 2025
Due Date
Dec 16, 2025
Release: Nov 24, 2025
Close: Dec 16, 2025
Trail phase 2 project.
AvailablePremium
Access the largest public sector contact database
Project consists of constructing a connection from the existing trail. The trail also travels through dinglewood park to the intersection of 18th avenue and 13th street. The project is within the city property and public right of way. The project length is approx 4,956 lf and includes a 10' wide concrete trail, landscape improvements, stormwater improvements, and trail amenities. Additional work associated with the project includes minor demolition and clearing, erosion control, grading, and signage. 52 lf san sewer pipe, 8 in, ductile iron, incl. 8in concrete encasement; 43 lf san sewer pipe, 8 in, ductile iron; 2 ea class b conc. dip to rcp transition collar. See outside link.
Posted Date
Oct 16, 2025
Due Date
Dec 17, 2025
Release: Oct 16, 2025
Close: Dec 17, 2025
Project consists of constructing a connection from the existing trail. The trail also travels through dinglewood park to the intersection of 18th avenue and 13th street. The project is within the city property and public right of way. The project length is approx 4,956 lf and includes a 10' wide concrete trail, landscape improvements, stormwater improvements, and trail amenities. Additional work associated with the project includes minor demolition and clearing, erosion control, grading, and signage. 52 lf san sewer pipe, 8 in, ductile iron, incl. 8in concrete encasement; 43 lf san sewer pipe, 8 in, ductile iron; 2 ea class b conc. dip to rcp transition collar. See outside link.
AvailableDesign & Construction of Chalk Hill Trail Phase 1.
Posted Date
Nov 19, 2025
Due Date
Jan 15, 2026
Release: Nov 19, 2025
Close: Jan 15, 2026
Design & Construction of Chalk Hill Trail Phase 1.
AvailableConstruction of approx. 5.4 miles of Rail Trail; Installation of approx. 1,465 LF of culvert pipe ranging 15" through 36"; Shaping/cleaning of ditches and shoulders for 5.4 miles of Rail Trail; Improvements to four (4) existing rail bridges; Installation of aggregate ballast repair in select areas; Installation of separation fabric, aggregate base course, and aggregate top course for surfacing of the 5.4 miles of Rail Trail; Installation of controlled access gates, signage, bollards, and trail appurtenances; Clearing/grubbing; Excavation/earthwork associated with slip repairs; Restoration Work – Seeding, mulching, disposal of trash/debris.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Construction of approx. 5.4 miles of Rail Trail; Installation of approx. 1,465 LF of culvert pipe ranging 15" through 36"; Shaping/cleaning of ditches and shoulders for 5.4 miles of Rail Trail; Improvements to four (4) existing rail bridges; Installation of aggregate ballast repair in select areas; Installation of separation fabric, aggregate base course, and aggregate top course for surfacing of the 5.4 miles of Rail Trail; Installation of controlled access gates, signage, bollards, and trail appurtenances; Clearing/grubbing; Excavation/earthwork associated with slip repairs; Restoration Work – Seeding, mulching, disposal of trash/debris.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis