Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Primary Spillway Repairs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide spillway gate replacments. Replacement spillway gates components include: 1. Fabricate minimum five (5) and maximum eleven (11) new vertical lift steel spillway gates offsite Including paint, non-destructive testing (NDT), seals and seal heaters, cathodic protection, wheels, dogging and latching mechanisms. See attached file.
Posted Date
Apr 17, 2025
Due Date
Apr 29, 2028
Release: Apr 17, 2025
Close: Apr 29, 2028
Provide spillway gate replacments. Replacement spillway gates components include: 1. Fabricate minimum five (5) and maximum eleven (11) new vertical lift steel spillway gates offsite Including paint, non-destructive testing (NDT), seals and seal heaters, cathodic protection, wheels, dogging and latching mechanisms. See attached file.
Premium
Access the largest public sector contact database
Cpw is seeking personal services to inspect, clean, and assist cpw with maintenance of the spillway nets at both highline lake state park and elkhead reservoir state park.
Posted Date
Nov 25, 2025
Due Date
Jan 5, 2026
Release: Nov 25, 2025
Close: Jan 5, 2026
Cpw is seeking personal services to inspect, clean, and assist cpw with maintenance of the spillway nets at both highline lake state park and elkhead reservoir state park.
AvailableThe City of Suffolk is soliciting bids to replace the superstructure of the Speights Spillway Bridge, including all plant, labor, materials, traffic detours, dismantling and removal of the existing superstructure per the contract documents. Work must follow AASHTO, VDOT, and MUTCD standards and be completed within 275 calendar days from Notice to Proceed.
Posted Date
Dec 2, 2025
Due Date
Jan 9, 2026
Release: Dec 2, 2025
Close: Jan 9, 2026
The City of Suffolk is soliciting bids to replace the superstructure of the Speights Spillway Bridge, including all plant, labor, materials, traffic detours, dismantling and removal of the existing superstructure per the contract documents. Work must follow AASHTO, VDOT, and MUTCD standards and be completed within 275 calendar days from Notice to Proceed.
AvailableProject involves the construction of improvements to Griffith Lake Dam located in Kent and Sussex Counties. The improvements include, but are not limited to _Demolition/removal of the existing spillway and the north and south abutment training walls; construction of new pile supported cast-in-place concrete spillway, runout apron, outlet structure and abutment walls; installation of a galvanized steel bar screen trash rack and a multi-leaf self-contained stainless steel weir gate and associated site work.
Posted Date
Nov 10, 2025
Due Date
Jan 21, 2026
Release: Nov 10, 2025
Close: Jan 21, 2026
Project involves the construction of improvements to Griffith Lake Dam located in Kent and Sussex Counties. The improvements include, but are not limited to _Demolition/removal of the existing spillway and the north and south abutment training walls; construction of new pile supported cast-in-place concrete spillway, runout apron, outlet structure and abutment walls; installation of a galvanized steel bar screen trash rack and a multi-leaf self-contained stainless steel weir gate and associated site work.