This project consists of pedestrian, roadway, and intersection improvements. Improvements including full depth asphalt pavement, milling and inlay, concrete curb and gutter, concrete median, concrete sidewalk, signing, pavement marking, storm drainage improvements, traffic signal modification, and grading.
Project includes approx. 729 SY 4" concrete sidewalk, 3 EA wheelchair ramp, signage, pavement marking, 789 GL tack coat, 3,307 SY milling, 0.009 GLM rumble strips, 65 LF 18" storm drain pipe, 2 EA storm sewer manhole, 2 EA adjust catch basin to grade, 2,225 SY sod, 0.13 TN fertilizer mixed grade, 495 SY erosion control mats, 142 LF 2" nonmetal conduit, 142 LF directional bore, 8 EA lighting STD, 8 EA LED luminaire, 1 EA electrical service point.