Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
110 LF of 18" RCP, ASTM C-76, Class III, all depths, (including bedding and backfill), complete in place. 1 Ea standard type "C" manhole for 42" and smaller pipe, all depths, complete in place. 190 SY of 5" thick reinforced concrete slope paving, (including filter fabric, weep holes, toe walls, re-bar, and expansion joints), complete in place. 2,125 LF of 5' wide conc sidewalk, complete in place. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Detention and mass grading.
Posted Date
Jan 2, 2026
Due Date
Feb 3, 2026
Release: Jan 2, 2026
Close: Feb 3, 2026
Detention and mass grading.
AvailableWork includes 10 CY extra excavation (hand labor); 100 CY extra excavation (machine); 10 CY extra concrete (class a); 10 CY extra concrete (class b); 10 ton extra cement stabilized sand (bedding or backfill) for water lines; 2 sacks/ton; 10 ton extra cement stabilized sand (bedding or backfill) for storm sewer; 1-1/2 sacks/ton; 100 CY crushed stone in trench bottom for pipe bedding in wet sand areas, including compaction, complete in place; 500 CY cement stabilized crushed stone for pipe bedding in wet sand areas, including compaction, complete in place; 100 CY cement stabilized sand for pipe bedding in wet sand areas, including compaction, complete in place; 2,500 LF deep wells for dewatering, complete in place. See attached file.
Posted Date
Dec 18, 2025
Due Date
Jan 28, 2026
Release: Dec 18, 2025
Close: Jan 28, 2026
Work includes 10 CY extra excavation (hand labor); 100 CY extra excavation (machine); 10 CY extra concrete (class a); 10 CY extra concrete (class b); 10 ton extra cement stabilized sand (bedding or backfill) for water lines; 2 sacks/ton; 10 ton extra cement stabilized sand (bedding or backfill) for storm sewer; 1-1/2 sacks/ton; 100 CY crushed stone in trench bottom for pipe bedding in wet sand areas, including compaction, complete in place; 500 CY cement stabilized crushed stone for pipe bedding in wet sand areas, including compaction, complete in place; 100 CY cement stabilized sand for pipe bedding in wet sand areas, including compaction, complete in place; 2,500 LF deep wells for dewatering, complete in place. See attached file.
Montgomery County MUD No. 213 is soliciting sealed bids for Lake Celestine Phase 1A mass grading, water, sanitary sewer, storm drainage, and paving improvements covering approximately 104 acres in Montgomery County, Texas. Bids are due at 10:00 a.m. local time on February 5, 2026, and may be submitted online via CivCastUSA.com or delivered to the office of Bleyl Engineering in Conroe, Texas. Bid documents (plans, specifications, soils and environmental reports) are available at CivCastUSA, and a non-mandatory remote pre-bid conference will be held on January 29, 2026 at 10:00 a.m. local time via Microsoft Teams.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
Montgomery County MUD No. 213 is soliciting sealed bids for Lake Celestine Phase 1A mass grading, water, sanitary sewer, storm drainage, and paving improvements covering approximately 104 acres in Montgomery County, Texas. Bids are due at 10:00 a.m. local time on February 5, 2026, and may be submitted online via CivCastUSA.com or delivered to the office of Bleyl Engineering in Conroe, Texas. Bid documents (plans, specifications, soils and environmental reports) are available at CivCastUSA, and a non-mandatory remote pre-bid conference will be held on January 29, 2026 at 10:00 a.m. local time via Microsoft Teams.
Construction of remaining sila mass grading; work includes approx. 5 ac. of heavy clearing & grubbing, including off-site disposal of cleared material; Approx. 420,000 CY of cut and fill; Approx. 1,000 hr of surface water dewatering (pumping).
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
Construction of remaining sila mass grading; work includes approx. 5 ac. of heavy clearing & grubbing, including off-site disposal of cleared material; Approx. 420,000 CY of cut and fill; Approx. 1,000 hr of surface water dewatering (pumping).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis