Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Vista is seeking a team composed of a qualified engineering firm and a landscape architectural firm to provide professional services for the design and construction of the E. Vista Way Raised Median Project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Vista is seeking a team composed of a qualified engineering firm and a landscape architectural firm to provide professional services for the design and construction of the E. Vista Way Raised Median Project.
Posted Date
Dec 9, 2025
Due Date
Jan 15, 2026
Release: Dec 9, 2025
Close: Jan 15, 2026
The City of Vista is seeking a team composed of a qualified engineering firm and a landscape architectural firm to provide professional services for the design and construction of the E. Vista Way Raised Median Project.
AvailablePremium
Access the largest public sector contact database
Work consists of constructing a raised median island, include survey, clearing and grubbing, removals, excavation, grading, construction of PCC curbs, gutters, sidewalks and concrete structures; installation of storm drain pipes, catch basins, and drainage appurtenances; cold milling, pavement reconstruction, asphalt overlays with reinforcing fibers, and pavement restoration; signing, striping, and replacement of traffic signal loop detectors; implementation of erosion control plan & BMPs and traffic control measures; installation of removable bollards and grouted river rock median surfacing; and all other incidental work
Posted Date
Nov 17, 2025
Due Date
Dec 15, 2025
Release: Nov 17, 2025
Close: Dec 15, 2025
Work consists of constructing a raised median island, include survey, clearing and grubbing, removals, excavation, grading, construction of PCC curbs, gutters, sidewalks and concrete structures; installation of storm drain pipes, catch basins, and drainage appurtenances; cold milling, pavement reconstruction, asphalt overlays with reinforcing fibers, and pavement restoration; signing, striping, and replacement of traffic signal loop detectors; implementation of erosion control plan & BMPs and traffic control measures; installation of removable bollards and grouted river rock median surfacing; and all other incidental work
AvailableWork consists of constructing a raised median island, include survey, clearing and grubbing, removals, excavation, grading, construction of PCC curbs, gutters, sidewalks and concrete structures; installation of storm drain pipes, catch basins, and drainage appurtenances; cold milling, pavement reconstruction, asphalt overlays with reinforcing fibers, and pavement restoration; signing, striping, and replacement of traffic signal loop detectors; implementation of erosion control plan & BMPs and traffic control measures; installation of removable bollards and grouted river rock median surfacing; and all other incidental work
Posted Date
Nov 17, 2025
Due Date
Dec 15, 2025
Release: Nov 17, 2025
Close: Dec 15, 2025
Work consists of constructing a raised median island, include survey, clearing and grubbing, removals, excavation, grading, construction of PCC curbs, gutters, sidewalks and concrete structures; installation of storm drain pipes, catch basins, and drainage appurtenances; cold milling, pavement reconstruction, asphalt overlays with reinforcing fibers, and pavement restoration; signing, striping, and replacement of traffic signal loop detectors; implementation of erosion control plan & BMPs and traffic control measures; installation of removable bollards and grouted river rock median surfacing; and all other incidental work
AvailableThe City of Durham seeks proposals for right-of-way maintenance services, including mowing, trimming, edging, blowing, and litter removal along Martin Luther King Jr. Parkway. The contract term is three years, covering approximately 5.3 miles of roadway and 3.1 miles of median. Contractors must provide all necessary tools, equipment, and materials.
Posted Date
Nov 17, 2025
Due Date
Dec 22, 2025
Release: Nov 17, 2025
Close: Dec 22, 2025
The City of Durham seeks proposals for right-of-way maintenance services, including mowing, trimming, edging, blowing, and litter removal along Martin Luther King Jr. Parkway. The contract term is three years, covering approximately 5.3 miles of roadway and 3.1 miles of median. Contractors must provide all necessary tools, equipment, and materials.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis