Summary
Generally, the successful bidder shall, as part of the services rendered, perform all design, engineering, drafting, route selection, permitting, survey, geo-technical, environmental, concurrences, instrumentation, electrical, start-up/commissioning, pickling, easement/easement preparation /recording and other services in accordance with the final construction contract. Principal items of work generally include new steel high-pressure natural gas lines, site acquisition and pad work for M&R Stations, design, construction, installation & commissioning of 1 ea. plant delivery meters & regulators station, 1 ea. distribution meter and regulator station, hot tap on 12-inch 720 pipeline, filtration, telemetry, new pipeline lateral, including a HDD under the Tombigbee River. Perform an odorant pickle of the pipeline segment. A meter & regulator station for a new receipt point off NextEras Lowman pipeline system.