Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The new playground equipment will replace an existing and outdated play structure located in the park. Scope of Project: This project consists of the design and procurement of a playground system and the installation of the new equipment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Design, Furnish and Install Playground Equipment.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
Design, Furnish and Install Playground Equipment.
AvailablePremium
Access the largest public sector contact database
DESIGN-BUILD. Design, provide, and install new playground equipment.
Posted Date
Nov 24, 2025
Due Date
Jan 12, 2026
Release: Nov 24, 2025
Close: Jan 12, 2026
DESIGN-BUILD. Design, provide, and install new playground equipment.
AvailableCity of Spring Hill requests qualified playground equipment manufacturers/vendors to design, supply, remove existing equipment, and install an inclusive, ADA/IPEMA/CPSC/ASTM-compliant playground at Harvey Park. Scope includes raising the play area a minimum of 1 foot with drainage and grading plans, site preparation, factory-certified installation, documentation of warranties and product liability insurance, and meeting specified bonding and insurance requirements. Project completion is required within 120 days of Notice to Proceed; bid security and 100% performance/payment bonds are required.
Posted Date
Nov 24, 2025
Due Date
Jan 12, 2026
Release: Nov 24, 2025
Close: Jan 12, 2026
City of Spring Hill requests qualified playground equipment manufacturers/vendors to design, supply, remove existing equipment, and install an inclusive, ADA/IPEMA/CPSC/ASTM-compliant playground at Harvey Park. Scope includes raising the play area a minimum of 1 foot with drainage and grading plans, site preparation, factory-certified installation, documentation of warranties and product liability insurance, and meeting specified bonding and insurance requirements. Project completion is required within 120 days of Notice to Proceed; bid security and 100% performance/payment bonds are required.
AvailableThe City of Holyoke Department of Public Works seeks qualifications from engineering firms to complete the final design and bid‑ready construction documents for the River Terrace Combined Sewer Separation Project, currently at 60% design. Submissions are due December 12, 2025 at 2:00 PM Eastern via the COMMBUYS portal.
Posted Date
Nov 12, 2025
Due Date
Dec 12, 2025
Release: Nov 12, 2025
Close: Dec 12, 2025
The City of Holyoke Department of Public Works seeks qualifications from engineering firms to complete the final design and bid‑ready construction documents for the River Terrace Combined Sewer Separation Project, currently at 60% design. Submissions are due December 12, 2025 at 2:00 PM Eastern via the COMMBUYS portal.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis