Summary
Furnishing and installing 1 control building which includes installing government furnished control panels (230kV only), relays, and a station & communication battery system; furnishing and installing new cable trenches from new control building to 69kV, 161kV, and 230kV yards; replacing 2 cable trench crossings; removing existing fiber from 69kV nipco bay to existing control building; furnishing and installing fiber from new control building to existing service building and from new control building to new fiber optic splice enclosure; furnishing and installing 1 station service lineup; removal of pad mount station service transformers, safety switches, automatic transfer switch and main distribution switchboard for return to wapa; expanding and upgrading the 230kV yard which includes the following: installation of government furnished circuit breakers, instrument transformers and disconnect switches, furnishing and installing electrical equipment supports, 1 take-off structure, and outdoor bus systems, furnishing and installing 1 fiber optic splice enclosure and 1 pull box; furnishing and installing control and power cables; furnishing and installing concrete foundations; demolition and removal of existing foundations; furnishing and installing grounding and conduit systems. See attached file.