Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Development of a mechanical fuels treatment approx. two miles west. The scope of work includes creating a mechanically treated, 300-foot-wide linear fuels treatment area. The successful contractor will remove and process all brush, shrubs, and small trees within the designated area, and will be responsible for providing all necessary equipment, qualified operators, and transportation and lodging arrangements to complete the project during the winter season.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide little river park. See outside link.
Posted Date
Dec 2, 2025
Due Date
Dec 18, 2025
Release: Dec 2, 2025
Close: Dec 18, 2025
Provide little river park. See outside link.
AvailableThe proposed project includes the cured-in-place pipe (CIPP) lining rehabilitation of approx. 2,744 LF of 42” sewer pipes along the Lower Mill River Interceptor.
Posted Date
Oct 21, 2025
Due Date
Dec 18, 2025
Release: Oct 21, 2025
Close: Dec 18, 2025
The proposed project includes the cured-in-place pipe (CIPP) lining rehabilitation of approx. 2,744 LF of 42” sewer pipes along the Lower Mill River Interceptor.
AvailableProvide geotechnical engineering and construction materials testing and inspection services.
Posted Date
Dec 4, 2025
Due Date
Dec 16, 2025
Release: Dec 4, 2025
Close: Dec 16, 2025
Provide geotechnical engineering and construction materials testing and inspection services.
AvailableConstruct a standard design Advanced Individual Training (AIT) Battalion Complex to support 600 Soldiers. Primary facilities include: standard design AIT Barracks/Company Operations Facility(ies)(B/COF) for two companies, two (2) lawn equipment buildings, and 2 physical training stations. Construction includes building tornado/storm protection measures; information systems; fire detection and sprinkler suppression systems; integrated energy monitoring and control system (EMCS) connected to base monitoring systems; intrusion detection system (IDS) and alarm systems; and antiterrorism/force protection (AT/FP) measures.
Posted Date
Sep 16, 2025
Due Date
Jan 23, 2026
Release: Sep 16, 2025
Close: Jan 23, 2026
Construct a standard design Advanced Individual Training (AIT) Battalion Complex to support 600 Soldiers. Primary facilities include: standard design AIT Barracks/Company Operations Facility(ies)(B/COF) for two companies, two (2) lawn equipment buildings, and 2 physical training stations. Construction includes building tornado/storm protection measures; information systems; fire detection and sprinkler suppression systems; integrated energy monitoring and control system (EMCS) connected to base monitoring systems; intrusion detection system (IDS) and alarm systems; and antiterrorism/force protection (AT/FP) measures.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis