Summary
The contractor shall: Containing dust is paramount to a successful project. All equipment used must contain dust. In addition, a separate HEPA type filtering system is required, to aid in controlling dust. Provide a submittal on what the contractor plans to use to contain dust for approval. The entire flooring will be professionally prepared up to the cove base and up to the retracted bleachers to ensure proper adhesion for the new paint and finish coats. The process must be performed in a manner that leaves all existing lines and logos intact and undamaged. If damage occurs the contractor shall make repairs at no additional cost. The floor is approx. 11,100SF. Two regulation pickleball court lines will be accurately measured, marked, and painted onto the prepared surface using high-quality, durable athletic court paint. Provide a color pallet for final color choice by customer.