Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Mecklenburg County Asset & Facility Management seeks sealed, hand-delivered proposals to construct a DC Fast Charger in the parking lot at 3205 Freedom Dr., Charlotte, NC. Bids are due by 2:00 PM ET on December 11, 2025; bonds are required and a pre-bid meeting is scheduled for November 24.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Install and operate public dc fast chargers (DCFC) for electric vehicles (EVS) within one (1) driving mile of select roadway exits.
Posted Date
Aug 18, 2025
Due Date
Jan 21, 2026
Release: Aug 18, 2025
Close: Jan 21, 2026
Install and operate public dc fast chargers (DCFC) for electric vehicles (EVS) within one (1) driving mile of select roadway exits.
AvailablePremium
Access the largest public sector contact database
Work includes installing electric vehicle (ev) charging infrastructure at the cmpd providence division station to power the city's ev fleet. Specifically, the project includes the installation of six (6) dual port 80 amp level ii chargers, one (1) 200 kw dc fast charger, and the preparation of five (5) additional make-ready locations for future level ii dual port chargers.
Posted Date
Nov 6, 2025
Due Date
Dec 16, 2025
Release: Nov 6, 2025
Close: Dec 16, 2025
Work includes installing electric vehicle (ev) charging infrastructure at the cmpd providence division station to power the city's ev fleet. Specifically, the project includes the installation of six (6) dual port 80 amp level ii chargers, one (1) 200 kw dc fast charger, and the preparation of five (5) additional make-ready locations for future level ii dual port chargers.
AvailableWork includes installing electric vehicle (ev) charging infrastructure at the cmpd providence division station to power the city's ev fleet. Specifically, the project includes the installation of six (6) dual port 80 amp level ii chargers, one (1) 200 kw dc fast charger, and the preparation of five (5) additional make-ready locations for future level ii dual port chargers.
Posted Date
Nov 6, 2025
Due Date
Dec 16, 2025
Release: Nov 6, 2025
Close: Dec 16, 2025
Work includes installing electric vehicle (ev) charging infrastructure at the cmpd providence division station to power the city's ev fleet. Specifically, the project includes the installation of six (6) dual port 80 amp level ii chargers, one (1) 200 kw dc fast charger, and the preparation of five (5) additional make-ready locations for future level ii dual port chargers.
AvailableProject consists of interior buildout. See outside link.
Posted Date
-
Due Date
Jan 17, 2026
Release: -
Close: Jan 17, 2026
Project consists of interior buildout. See outside link.