Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal & installation of middle school gym lockers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Uinta County School District #1 is soliciting sealed bids for the Davis Middle School Roof Replacement at 837 No Name Street, Evanston, WY. Work includes removal of the existing roof and installation a new roof. A mandatory pre‑bid conference is scheduled for 2/18/2026 at 9:00 AM, and bids are due by 3/4/2026 at 1:00 PM at the District Office.
Posted Date
-
Due Date
Mar 4, 2026
Release: -
Close: Mar 4, 2026
Uinta County School District #1 is soliciting sealed bids for the Davis Middle School Roof Replacement at 837 No Name Street, Evanston, WY. Work includes removal of the existing roof and installation a new roof. A mandatory pre‑bid conference is scheduled for 2/18/2026 at 9:00 AM, and bids are due by 3/4/2026 at 1:00 PM at the District Office.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Locker room renovation project. Work consists of general construction work, plumbing work, heating, ventilation, and air conditioning work, and electrical work.
Posted Date
Jan 22, 2026
Due Date
Feb 19, 2026
Release: Jan 22, 2026
Close: Feb 19, 2026
Locker room renovation project. Work consists of general construction work, plumbing work, heating, ventilation, and air conditioning work, and electrical work.
AvailableReplace the existing hallway lockers.
Posted Date
Jan 23, 2026
Due Date
Feb 6, 2026
Release: Jan 23, 2026
Close: Feb 6, 2026
Replace the existing hallway lockers.
AvailableThe University of North Carolina at Wilmington (UNCW) is soliciting vendors to supply and install smart lockers and mailboxes (minimum 240 units) at Seahawk Crossing and Seahawk Landing, including power, network connectivity, and integration with campus IT. The contract requires a complete IT/package tracking solution with an administrative dashboard, mobile app support, and third-party carrier API integration while meeting ADA and building-code requirements. Bids are due Feb 26, 2026 at 2:00 PM ET; the contract is scheduled to commence upon execution (around Mar 2, 2026) with installations to be completed by Aug 1, 2026.
Posted Date
Jan 28, 2026
Due Date
Feb 26, 2026
Release: Jan 28, 2026
Close: Feb 26, 2026
The University of North Carolina at Wilmington (UNCW) is soliciting vendors to supply and install smart lockers and mailboxes (minimum 240 units) at Seahawk Crossing and Seahawk Landing, including power, network connectivity, and integration with campus IT. The contract requires a complete IT/package tracking solution with an administrative dashboard, mobile app support, and third-party carrier API integration while meeting ADA and building-code requirements. Bids are due Feb 26, 2026 at 2:00 PM ET; the contract is scheduled to commence upon execution (around Mar 2, 2026) with installations to be completed by Aug 1, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →