Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rehabilitating the existing sanitary sewer, including COPP, point repairs, manhole touch-ups, debris removal, etc.; 350 LF of Heavy Grease Removal and Cleaning; 24 Ea . Removal of Roots At Service Lead by Remote Cutting Application; 1870 LF of . 8" Cured-In-Place-Pipe Sanitary Sewer Rehab.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Rehabilitation of approximately 11,594 LF of 8" and 850 LF of 10", and 930 LF of 12" existing sanitary sewer using pipe bursting method. Work also includes rehabilitation of lateral connections, point repairs, recoating of existing sanitary manholes, and rehabilitation of existing conditions in a residential community. 14,006 LF CCTV Video inspection for pre and post rehabilitation of sewer lines. 24 EA sewer main point repairs including excavation, bypass pumping, dewatering, bedding material, preparation and replacing irrigation lines. 100 LF 4" sidewalk, 633 LF 8" DI pipe with CIPP.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Close: Dec 16, 2025
Rehabilitation of approximately 11,594 LF of 8" and 850 LF of 10", and 930 LF of 12" existing sanitary sewer using pipe bursting method. Work also includes rehabilitation of lateral connections, point repairs, recoating of existing sanitary manholes, and rehabilitation of existing conditions in a residential community. 14,006 LF CCTV Video inspection for pre and post rehabilitation of sewer lines. 24 EA sewer main point repairs including excavation, bypass pumping, dewatering, bedding material, preparation and replacing irrigation lines. 100 LF 4" sidewalk, 633 LF 8" DI pipe with CIPP.
AvailableProject generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Close: Dec 18, 2025
Project generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
AvailableThe City of Grove City, Ohio is soliciting sealed bids for its 2025 Sanitary Sewer Rehabilitation project, which includes rehabilitating approximately 2,312 LF of 8‑inch, 492 LF of 15‑inch, and 1,728 LF of 18‑inch sanitary sewer with CIPP liners, along with short liners, chemical grouting, manhole repairs, and point repairs. Bids are due by 11:00 a.m. local time on December 12, 2025 (04:00 PM UTC).
Posted Date
-
Due Date
Dec 12, 2025
Release: -
Close: Dec 12, 2025
The City of Grove City, Ohio is soliciting sealed bids for its 2025 Sanitary Sewer Rehabilitation project, which includes rehabilitating approximately 2,312 LF of 8‑inch, 492 LF of 15‑inch, and 1,728 LF of 18‑inch sanitary sewer with CIPP liners, along with short liners, chemical grouting, manhole repairs, and point repairs. Bids are due by 11:00 a.m. local time on December 12, 2025 (04:00 PM UTC).
Work includes approx. 7,394 LF of 8" Preparatory Sewer Cleaning and Pre-Lining Televising; 230 LF of 10" Preparatory Sewer Cleaning and Pre-Lining Televising; 2 EA of Sanitary Sewer Manhole Grouting; 2 EA of Sanitary Sewer Manhole Lining; 4 EA of Sanitary Lateral Grouting; 5 EA of Repair Protruding Tap Without Excavation. See outside link.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Work includes approx. 7,394 LF of 8" Preparatory Sewer Cleaning and Pre-Lining Televising; 230 LF of 10" Preparatory Sewer Cleaning and Pre-Lining Televising; 2 EA of Sanitary Sewer Manhole Grouting; 2 EA of Sanitary Sewer Manhole Lining; 4 EA of Sanitary Lateral Grouting; 5 EA of Repair Protruding Tap Without Excavation. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis