Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes curb & gutter 3,900 LF; HMA asphalt pavement, type MT 1,400 TN; topsoil 700 CY; seeding, fertilizer and mulching 4000 SY; silt fence 500 LF.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes removals, grading, aggregate, concrete pavement, asphalt pavement, curb and gutter, concrete sidewalk, storm sewer, erosion control, permanent signing, traffic control, pavement marking, sanitary, water, restoration.
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
Work includes removals, grading, aggregate, concrete pavement, asphalt pavement, curb and gutter, concrete sidewalk, storm sewer, erosion control, permanent signing, traffic control, pavement marking, sanitary, water, restoration.
Premium
Access the largest public sector contact database
Removal and replacement of existing concrete including concrete pavement, cross-pan, sidewalk, curb and gutter, curb ramps.
Posted Date
Nov 21, 2025
Due Date
Jan 13, 2026
Release: Nov 21, 2025
Close: Jan 13, 2026
Removal and replacement of existing concrete including concrete pavement, cross-pan, sidewalk, curb and gutter, curb ramps.
AvailableProject will replace curb and gutter deficiencies along the corridor. Work also includes 2,013 LF combined curb & gutter (type varies); 20 SF 4" concrete sidewalk remove & replace; 500 SF 6" concrete for approach transitions; 1 EA tree removal; 90 TN aggregate base - ab-3 (2") for under curbs; 120 TN asphalt pavement patching (2"); 1 EA steel plate driveway access; 0.10 AC seeding, fertilizing and mulch; 1 LS traffic control. See attached file.
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Close: Jan 6, 2026
Project will replace curb and gutter deficiencies along the corridor. Work also includes 2,013 LF combined curb & gutter (type varies); 20 SF 4" concrete sidewalk remove & replace; 500 SF 6" concrete for approach transitions; 1 EA tree removal; 90 TN aggregate base - ab-3 (2") for under curbs; 120 TN asphalt pavement patching (2"); 1 EA steel plate driveway access; 0.10 AC seeding, fertilizing and mulch; 1 LS traffic control. See attached file.
AvailableAsphalt and paving supplies.
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Close: Jan 6, 2026
Asphalt and paving supplies.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis