Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Culverts and bridge materials, metal culvert pipes, dual wall plastic corrugated culvert pipe, prestressed concrete bridge beams, concrete bridge packages, laminated timber deck panels, and treated timber bridge package to be usedby the county highway department for 2026 calendar year.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge reconstruction including replacement with 21" prestressed concrete box beams and approach work.
Posted Date
Dec 19, 2025
Due Date
Jan 9, 2026
Release: Dec 19, 2025
Close: Jan 9, 2026
Bridge reconstruction including replacement with 21" prestressed concrete box beams and approach work.
AvailableBridge reconstruction including replacement with 36" prestressed concrete i-beams, cip abutments and approach work.
Posted Date
Dec 19, 2025
Due Date
Jan 9, 2026
Release: Dec 19, 2025
Close: Jan 9, 2026
Bridge reconstruction including replacement with 36" prestressed concrete i-beams, cip abutments and approach work.
AvailableThe objective of this research is to evaluate the requirements for Service III limit state regarding design and load rating for tension in prestressed concrete bridge superstructure members to ensure consistency and reliability, while maintaining operational flexibility.
Posted Date
Nov 6, 2025
Due Date
Jan 12, 2026
Release: Nov 6, 2025
Close: Jan 12, 2026
The objective of this research is to evaluate the requirements for Service III limit state regarding design and load rating for tension in prestressed concrete bridge superstructure members to ensure consistency and reliability, while maintaining operational flexibility.
AvailableIDOT is soliciting bids to remove existing dual corrugated metal pipe culverts at three locations on IL Route 116 in Pontiac (Livingston County) and replace them with a precast concrete box culvert. The work includes ditch cleaning, pavement removal and replacement, landscaping, and other related construction activities. Bids are due at the January 16, 2026 letting at 12:00 PM local time.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
IDOT is soliciting bids to remove existing dual corrugated metal pipe culverts at three locations on IL Route 116 in Pontiac (Livingston County) and replace them with a precast concrete box culvert. The work includes ditch cleaning, pavement removal and replacement, landscaping, and other related construction activities. Bids are due at the January 16, 2026 letting at 12:00 PM local time.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →