Retrieving RFP details
Release
Close
City of Umatilla
Project proposes the construction of a new raw river water intake pump station/POD, and the portion of the new raw water transmission main on USACE property conveying raw water to the new WTF. Also included is the installation of fiber optic cables from the POD to the WTF within conduit installed as part of this project, as part of the pipeline construction project, and as part of the WTF construction contract. The major components of the project include: 1.Construction of a pump station (POD) including pumps, fish screens, a hydropneumatic surge tank, 2.Construction of approximately 340 feet of 30-inch and 36-inch diameter pipeline from the pump station to the property line, and 3.Demolition of the existing CTUIR pump station and pipeline. Adjacent projects designed by others will be constructed in tandem with this project, coordination of construction schedules and scope connections will be required.
Santa Clarita Valley Water Agency
Construction of the pump station. The project generally consists of construction of a 7,200 SF building to serve as a potable water pump station with backup generator. The pump station includes but not limited to the suction and discharge headers, eight pump cans, four pumps, four motors, and associated electrical power distribution, lighting, and instrumentation & controls; and site work including a paved service road, site security fencing, and all associated work ("Work") as indication in the Contract Documents.
City of Celina
The project will include the installation of approx. 3,740 LF of 12" pipeline from their elevated storage tank site to the ground storage tank site. This project will also include the construction of a 1.0 million-gallon prestressed concrete water ground storage tank and the replacement of the existing horizontal split case pumps to increase capacity at the Harper Road Pump Station site.
Wyoming Valley Sanitary Authority
The purpose of this project is to replace all existing pumps, valves and associated piping, as well as remove and install a stainless steel floor and to strip and paint the interior of the dry well at Pump Station-4S (PS-4S). The existing pumps are obsolete. The upgrades will be done inside the dry well of the pump station which is an underground steel can type structure that is accessed by a single vertical ladder. The dry well is approx. 96” dia. x 96” tall and the ground level to the dry well floor is approx. 20'-0”. WVSA will provide the new pumps ONLY. The Contractor will provide all new fabrications, piping components, valves, gaskets, hardware, pipe supports, paint, paint supplies, tools, equipment and labor etc. to complete the scope of the project per WVSA supplied drawings and specs.
Release
Oct 28, 2025
Close
Dec 04, 2025