Summary
To perform the installation of showers replacement. but are not limited to: a) Remove and dispose of (1) shower stall in room #A123. b) Remove and dispose of (2) shower stall in room #C105. c) Remove and dispose of (1) shower stall in room #C113. d) Remove and dispose of shower valves in room #A123, #C105 and #C113. e) Install (4) Moen Posi-Temp rough valves with chrome trim. f) Add ½” isolation valves to (4) shower stalls. g) Install new drain/p-trap to (4) shower stalls. h) Test all plumbing for leaks. i) Contractor is responsible for all material and related debris from this project must be removed from plot boundaries. j) Contractor is responsible for any and all labor, required materials to perform project.