City of Schenectady
The City of Schenectady is soliciting sealed bids to replace the water main along Craig Street prior to planned complete streets work. Bids must be submitted via the City’s BidNet Direct portal by November 26, 2025, at 10:30 AM EST.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Everett
Construct approx. 1,020 LF of 12" ductile iron watermain and appurtenances, including relocation of an existing PRV station, site restoration, installation of water main in 18" casing on the existing I-5 bridge structure over the Snohomish River and BNSF Railroad, and removal and disposal of the existing 8" waterline on the I-5 bridge, and performing all other work as required by the contract.
Posted Date
Apr 15, 2025
Due Date
Nov 18, 2025
Release: Apr 15, 2025
City of Everett
Close: Nov 18, 2025
Construct approx. 1,020 LF of 12" ductile iron watermain and appurtenances, including relocation of an existing PRV station, site restoration, installation of water main in 18" casing on the existing I-5 bridge structure over the Snohomish River and BNSF Railroad, and removal and disposal of the existing 8" waterline on the I-5 bridge, and performing all other work as required by the contract.
City of Tallahassee
Installation of approximately 2,505 linear feet of new water main and associated valves, services, meters, fire hydrants and fittings. The project also includes other items incidental to the infrastructure replacement, such as: sediment & erosion control; disposal of materials removed; maintenance of traffic, and restoration of disturbed areas including driveways, curb and gutter, pavement, site restoration and other related items as identified in the Contract Documents.
Posted Date
Nov 9, 2025
Due Date
Dec 18, 2025
Release: Nov 9, 2025
City of Tallahassee
Close: Dec 18, 2025
Installation of approximately 2,505 linear feet of new water main and associated valves, services, meters, fire hydrants and fittings. The project also includes other items incidental to the infrastructure replacement, such as: sediment & erosion control; disposal of materials removed; maintenance of traffic, and restoration of disturbed areas including driveways, curb and gutter, pavement, site restoration and other related items as identified in the Contract Documents.
AvailableCity of Algood
Installation of approximately 4,300 LF of 12" ductile iron water main replacing existing main, including graded stone and paving replacement, service line and meter installations as well as all necessary appurtenances to provide a complete water line per the plans and specifications.
Posted Date
Oct 24, 2025
Due Date
Nov 20, 2025
Release: Oct 24, 2025
City of Algood
Close: Nov 20, 2025
Installation of approximately 4,300 LF of 12" ductile iron water main replacing existing main, including graded stone and paving replacement, service line and meter installations as well as all necessary appurtenances to provide a complete water line per the plans and specifications.
AvailableBorough of Mount Joy
Water main replacement. Including 35 LF of 12" Ductile iron pipe; 1,640 LF of 8" Ductile iron pipe; 760 LF of 6" Ductile iron pipe; 75 LF bore and jack railroad crossing (solid); 30 ea ductile iron fitting; 5 ea fire hydrant assembly; 19 ea water service reconnect; 350 LF type K copper tubing; 100 LF curb and sidewalk restoration; 1,670 SY trench restoration permanent pavement; 3,400 SY mill and overlay permanent pavement; 250 CY miscellaneous rock excavation (contigency item); 75 LF bore and jack railroad crossing (contingency item rock);
Posted Date
Sep 19, 2025
Due Date
Jan 13, 2026
Release: Sep 19, 2025
Borough of Mount Joy
Close: Jan 13, 2026
Water main replacement. Including 35 LF of 12" Ductile iron pipe; 1,640 LF of 8" Ductile iron pipe; 760 LF of 6" Ductile iron pipe; 75 LF bore and jack railroad crossing (solid); 30 ea ductile iron fitting; 5 ea fire hydrant assembly; 19 ea water service reconnect; 350 LF type K copper tubing; 100 LF curb and sidewalk restoration; 1,670 SY trench restoration permanent pavement; 3,400 SY mill and overlay permanent pavement; 250 CY miscellaneous rock excavation (contigency item); 75 LF bore and jack railroad crossing (contingency item rock);
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis