Summary
Streetscape and EV Charger. The project includes improvements along Crafton Boulevard, including but not limited to labor and materials associated with parking lot line striping removal and replacement; demolition of existing electric service, installation of a Level 2 EV charger and conduit/conductor, installation of street lights and conduit, 200 amp single phase 240/120v service, modification of existing site lighting circuit and controls; parking signage; planting of deciduous trees; wheel stop removal and replacement; concrete sidewalk restoration; site clearing and site preparation; site cleanup, plantings, and site restoration; E&S controls; construction documentation; and traffic control, site protection, resident and business notification, GPR survey, utility notification and coordination; complete in place.