Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Courtyard At High School.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for roofing upgrades at North Shore Senior High School, North Shore Senior High 10th Grade Center, and Cobb Sixth Grade Campus.
Posted Date
Jan 4, 2026
Due Date
Jan 22, 2026
Release: Jan 4, 2026
Close: Jan 22, 2026
This RFP is for roofing upgrades at North Shore Senior High School, North Shore Senior High 10th Grade Center, and Cobb Sixth Grade Campus.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace existing cooling-only ductless split systems and electric resistance heating at the Cornerstone Courtyard Apartments with new all-in-one packaged terminal heat pumps (PTHP) in residential units including all associated demolition, electrical modifications, and installation. The base bid includes replacement of existing cooling-only ductless split systems and electric resistance heating with new all-in-one packaged terminal heat pumps (PTHP) in residential units, including all associated demolition, electrical modifications, and installation work as detailed in the HVAC Narrative. Alternate 1: Eliminate removal of baseboard heaters and electrical connections in bedrooms. Eliminate installation of cove heaters and electrical connections in bedrooms, Alternate 2: Eliminate demolition of existing dryer exhaust ductwork to the outside. Existing dryer exhaust penetrations and ductwork to remain in place (capped/sealed as required by code). Note: this alternate makes no changes to the electrical scope with regard to the laundry equipment.
Posted Date
Dec 12, 2025
Due Date
Jan 9, 2026
Release: Dec 12, 2025
Close: Jan 9, 2026
Replace existing cooling-only ductless split systems and electric resistance heating at the Cornerstone Courtyard Apartments with new all-in-one packaged terminal heat pumps (PTHP) in residential units including all associated demolition, electrical modifications, and installation. The base bid includes replacement of existing cooling-only ductless split systems and electric resistance heating with new all-in-one packaged terminal heat pumps (PTHP) in residential units, including all associated demolition, electrical modifications, and installation work as detailed in the HVAC Narrative. Alternate 1: Eliminate removal of baseboard heaters and electrical connections in bedrooms. Eliminate installation of cove heaters and electrical connections in bedrooms, Alternate 2: Eliminate demolition of existing dryer exhaust ductwork to the outside. Existing dryer exhaust penetrations and ductwork to remain in place (capped/sealed as required by code). Note: this alternate makes no changes to the electrical scope with regard to the laundry equipment.
Seeks to enhance transportation alternatives and safety in the vicinity of Miami Beach Senior High School (MBSHS).
Posted Date
Nov 18, 2025
Due Date
Jan 12, 2026
Release: Nov 18, 2025
Close: Jan 12, 2026
Seeks to enhance transportation alternatives and safety in the vicinity of Miami Beach Senior High School (MBSHS).
AvailableNorthwest Community Schools is soliciting bids for the Northwest High School Addition project. The project involves various trades, including earthwork, utilities, asphalt paving, building and site concrete, masonry, and more. It is an Invitation for Bid (solicitation ID RFP‑NWCS‑260000000599‑1) with a pre‑bid meeting on 12/23/2025 and a closing date of 1/20/2026.
Posted Date
-
Due Date
Jan 20, 2026
Release: -
Close: Jan 20, 2026
Northwest Community Schools is soliciting bids for the Northwest High School Addition project. The project involves various trades, including earthwork, utilities, asphalt paving, building and site concrete, masonry, and more. It is an Invitation for Bid (solicitation ID RFP‑NWCS‑260000000599‑1) with a pre‑bid meeting on 12/23/2025 and a closing date of 1/20/2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →